Summary for Test 2018-06-04-35-2

Test performed: AASHTO T308-10

Project Information

Project IdentifiersProject ID: 212741
DEA: 020E1804
EFIS: 0200000022
DIST-CO-RTE-PM02-PLU-89-29.8/30.2
Award Date12/13/2017
Closeout Date12/17/2021
Work DescriptionBRIDGE REPLACEMENT
Location DescriptionPLUMAS COUNTY NEAR CANYON DAM FROM 0.2 MILE SOUTH TO 0.3 MILE NORTH OF LAKE ALMANOR SPILLWAY
QA Service Level1 (Verified on 12/06/2017)

Sample Information

Sample Taken Date06/04/2018 Sample Unique Key35
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/05/2018
Sample typeVerification A brief description of the sampleRAP
The quantity of what the sample constitutesJMF Verification From where was the sample collectedManufacturer
First name of sampler or witnessed byDerrick Last name of sampler or witnessed byCurry
Title of sampler Telephone number of sampler
Laboratory sample identificationD77438 Linked DIME Sample ID
The fabricator/manufacturer/facility nameSierra Cascade Aggregate and Asphalt Products Transportation Laboratory (TL) Number894777
Inspector Lot Number from the Transportation Laboratory (TL) FormJMF 18-04-S3 Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceDig It Construction
Aggregate Size3/8-inch Aggregate SourceUnknown
RAP Stockpile Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2018-06-04-35
DIME Test ID: 2018-06-04-35-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2019-01-22

Test Results


What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Colt Sweeny
Date of test: 06/07/2018
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 6.88 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/22/2019