Summary for Test 2019-01-11-2-3

Test performed: ASTM A970-15e1

Project Information

Project IdentifiersProject ID: 208945
DEA: 07288604
EFIS: 0700021080
COOP: 074663
DIST-CO-RTE-PM07-LA-710-6.0-9.4
Award Date09/02/2011
Closeout DateNot set
Work DescriptionGerald Desmond Bridge Replacement - A Design Build project. IQA samples will be selected by Port/Caltrans representatives and sent to Translab for testing.
Location DescriptionPort of Long Beach (District 7)
QA Service Level1 (Verified on 06/03/2013)

Sample Information

Sample Taken Date01/11/2019 Sample Unique Key2
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/11/2019
Sample typeQuality Assurance A brief description of the sampleHRC 555 T-Heads
The quantity of what the sample constitutes4 From where was the sample collectedFabricator
First name of sampler or witnessed byLorenzo Last name of sampler or witnessed byGarcia
Title of samplerQA Telephone number of sampler702 917-2503
Laboratory sample identificationUnknown Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameCMC Rebar Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormL115-006-19 Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeSMTL TM5 - Headed Bars Production or Authorization TestingProduction Testing
Rebar Heat Number(s)4081531 Head Manufacturer Lot Number(s)Friction Welding
Rebar Size8 Headed Bar Model NameHRC 555 T Heads
Size of HeadReduced Size - 4x Head Connection Type
Head ShapeCircular Rebar ManufacturerCMC
Head ManufacturerCMC HRC Head FabricatorCMC Rebar
Material Standard CodeASTM A706 Headed Bar Unique IDNot set

Test Details

DIME Sample ID: 2019-01-11-2
DIME Test ID: 2019-01-11-2-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: ASTM A970-15e1: Standard Specification for Headed Steel Bars for Concrete Reinforcement (Tensile)
Test Release Date: 2019-01-29

Test Results


Number of Headed Bar Samples: 1
Input Type: Measured
Tester's full name: Brian
Date of test: 01/22/2019
UTM: 400KIP
Temperature: 72 F
NumLot #Area (sqin)Peak Load (lbf)Tensile Strength (psi)CommentsTested By
12540.797529095300Bar BrokeBrian

General comments (publicly viewable) (Max 1000 characters): Bar Broke; OK Necking
Test Graph
Source: Partner Data Point File
Test graph for the Sample

Test was verified on 1/22/2019