Summary for Test 2014-06-01-9057804-3
Test performed: CTM 643-June 2007Project Information
Project Identifiers | Project ID: 209511 DEA: 080Q7403 EFIS: 0800020456 |
---|---|
DIST-CO-RTE-PM | 08-SBD-15-15.4/30.8 |
Award Date | 10/29/2013 |
Closeout Date | Not set |
Work Description | Design Build project provides pavement rehabilitation (including ramps) on I-15 near Cajon Pass, CA. |
Location Description | On I-15 from 0.4 mile north of Kenwood Avenue to 0.3 mile south of West Hesperia OH |
QA Service Level | 1 (Verified on 04/03/2014) |
Sample Information
Sample Taken Date | 06/01/2014 | Sample Unique Key | 9057804 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 06/02/2014 |
Sample type | Preliminary | A brief description of the sample | Soil |
The quantity of what the sample constitutes | 2 Bags | From where was the sample collected | Source |
First name of sampler or witnessed by | Unknown | Last name of sampler or witnessed by | Unknown |
Title of sampler | Not set | Telephone number of sampler | Not set |
Laboratory sample identification | 4155B | Linked DIME Sample ID | Not set |
The fabricator/manufacturer/facility name | PM 21.6 N/B Lane 5 | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
Structure name | Not set |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | Not set |
---|---|---|---|
The fabricator/manufacturer designation for the sample | Not set | A detailed description of where the material sample was collected | PM 21.6 N/B Lane 5 |
Where the material sample would have been placed if not sampled | Not set |
Test Details
DIME Sample ID: 2014-06-01-9057804
DIME Test ID: 2014-06-01-9057804-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 643-June 2007: Method for Determining Field and Laboratory Resistivity and pH Measurements for Soil and Water
Test Release Date: 2015-02-20
Test Results
The test method used?: Laboratory Resistivity Test
Input Type: Calculated
Tester's full name: Vincent Onoh
Date of test: 06/05/2014
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/20/2015 ✔