Summary for Test 2018-05-15-25-2

Test performed: AASHTO T30-15

Project Information

Project IdentifiersProject ID: 212562
DEA: 024G5504
EFIS: 0214000036
DIST-CO-RTE-PM02-SIS-5-2.7/R11.4
Award Date03/12/2018
Closeout Date10/05/2020
Work DescriptionRECONSTRUCT WITH HMA AND PCC, WIDEN STRUCTURE AND UPGRADE RAILS
Location DescriptionSISKIYOU COUNTY IN AND NEAR DUNSMUIR FROM SACRAMENTO RIVER BRIDGE TO 0.6 MILE SOUTH OF NORTH MOUNT SHASTA UNDERPASS
QA Service Level1 (Verified on 04/04/2018)

Sample Information

Sample Taken Date05/15/2018 Sample Unique Key25
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/15/2018
Sample typeVerification A brief description of the sampleCombined RAP, 3/8-inch Minus
The quantity of what the sample constitutesJMF Verification From where was the sample collectedManufacturer
First name of sampler or witnessed byAshton Last name of sampler or witnessed byErickson
Title of samplerCGI Telephone number of samplerUnknown
Laboratory sample identificationD77380B Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameJ F Shea Construction Inc - Fawndale Rock and Asphalt - Redding CA Transportation Laboratory (TL) Number897205
Inspector Lot Number from the Transportation Laboratory (TL) Form18-03-S3 Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceFawndale Rock and Asphalt, Reddimg, CA
Aggregate Size3/8-inch Aggregate SourceUnknown
RAP Stockpile Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set HMA PayNo

Test Details

DIME Sample ID: 2018-05-15-25
DIME Test ID: 2018-05-15-25-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2018-07-19

Test Results


Input Type: Calculated
Tester's full name: NRML-R
Date of test: 05/18/2018
Cumulative percent passing the 2 in. sieve: no data
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 95.2 %
Cumulative percent passing the 1/4 in. sieve: 77.1 %
Cumulative percent passing the #4 sieve: 66.7 %
Cumulative percent passing the #8 sieve: 48 %
Cumulative percent passing the #16 sieve: 34.3 %
Cumulative percent passing the #30 sieve: 24.9 %
Cumulative percent passing the #50 sieve: 18.1 %
Cumulative percent passing the #100 sieve: 13.5 %
Cumulative percent passing the #200 sieve: 10.61 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/19/2018