Summary for Test 2018-03-21-13-6
Test performed: CTM 202-Oct 2014Project Information
Project Identifiers | Project ID: 208945 DEA: 07288604 EFIS: 0700021080 COOP: 074663 |
---|---|
DIST-CO-RTE-PM | 07-LA-710-6.0-9.4 |
Award Date | 09/02/2011 |
Closeout Date | Not set |
Work Description | Gerald Desmond Bridge Replacement - A Design Build project. IQA samples will be selected by Port/Caltrans representatives and sent to Translab for testing. |
Location Description | Port of Long Beach (District 7) |
QA Service Level | 1 (Verified on 06/03/2013) |
Sample Information
Sample Taken Date | 03/21/2018 | Sample Unique Key | 13 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/29/2018 |
Sample type | Quality Control | A brief description of the sample | Lightweight Aggregate |
The quantity of what the sample constitutes | 2 bags | From where was the sample collected | Source |
First name of sampler or witnessed by | John | Last name of sampler or witnessed by | Dong |
Title of sampler | Unknown | Telephone number of sampler | Unknown |
Laboratory sample identification | 18-0046 | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Associated Signal Hill | Transportation Laboratory (TL) Number | C914206A |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | Not set |
Structure name | Not set |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | NA |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
The plant number | Unknown | A detailed description of where the material sample was collected | Stockpile |
Where the material sample would have been placed if not sampled | Unknown | Primary Aggregate Nominal Size | 3/8 inch |
The concrete mix design number | Unknown | Lot number | Not set |
Sublot number | Not set | Aggregate Mix Number | Not set |
HMA Pay | No |
Test Details
DIME Sample ID: 2018-03-21-13
DIME Test ID: 2018-03-21-13-6
Testing Lab: CT HQ - Sacramento Concrete Testing Laboratory
Test Method: CTM 202-Oct 2014: Method of Test for Determining Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2018-07-02
Test Results
What size aggregate is being tested?: 0.375 in x No. 8 - Coarse Aggregate
Input Type: Measured
Tester's full name: Bang Nguyen
Date of test: 06/26/2018
Cumulative mass retained on the 1/2 in. sieve: 0.0 grams
Cumulative mass retained on the 3/8 in. sieve: 66.6 grams
Cumulative mass retained on the #4 sieve: 462.6 grams
Cumulative mass retained on the #8 sieve: 263.8 grams
Cumulative mass retained on the pan: 114 grams
Total mass of sample tested: 907 grams
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 93 %
Cumulative percent passing the #4 sieve: 42 %
Cumulative percent passing the #8 sieve: 13 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/2/2018 ✔