Summary for Test 2018-06-13-1-1

Test performed: ASTM A970-15e1

Project Information

Project IdentifiersProject ID: 208945
DEA: 07288604
EFIS: 0700021080
COOP: 074663
DIST-CO-RTE-PM07-LA-710-6.0-9.4
Award Date09/02/2011
Closeout DateNot set
Work DescriptionGerald Desmond Bridge Replacement - A Design Build project. IQA samples will be selected by Port/Caltrans representatives and sent to Translab for testing.
Location DescriptionPort of Long Beach (District 7)
QA Service Level1 (Verified on 06/03/2013)

Sample Information

Sample Taken Date06/13/2018 Sample Unique Key1
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/20/2018
Sample typeIndependent Assurance A brief description of the sampleT-Heads
The quantity of what the sample constitutes145 From where was the sample collectedFabricator
First name of sampler or witnessed byJeff Last name of sampler or witnessed bySulka
Title of samplerUnknown Telephone number of samplerUnknown
Laboratory sample identificationUnknown Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameCMC Rebar Etiwanda Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormL81-024-18 Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeSMTL TM5 - Headed Bars Production or Authorization TestingProduction Testing
Rebar Heat Number(s)6503073802 Head Manufacturer Lot Number(s)6503073832
Rebar Size11 Headed Bar Model Name555 T Heads
Size of HeadFull Size - 9x Head Connection TypeForged
Head ShapeCircular Rebar ManufacturerGerdau
Head ManufacturerCMC Rebar Head FabricatorCMC Rebar
Material Standard CodeASTM A706 Headed Bar Unique IDNot set

Test Details

DIME Sample ID: 2018-06-13-1
DIME Test ID: 2018-06-13-1-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: ASTM A970-15e1: Standard Specification for Headed Steel Bars for Concrete Reinforcement (Tensile)
Test Release Date: 2018-06-28

Test Results


Number of Headed Bar Samples: 1
Input Type: Measured
Tester's full name: Fred
Date of test: 06/21/2018
UTM: 400KIP
Temperature: 72 F
NumLot #Area (sqin)Peak Load (lbf)Tensile Strength (psi)CommentsTested By
11181.5614819094990Bar BrokeFred

General comments (publicly viewable) (Max 1000 characters): Bar Broke; OK Necking
Test Graph
Source: Partner Data Point File
Test graph for the Sample

Test was verified on 6/21/2018