Summary for Test 2018-01-24-4-2
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 209114 DEA: 040A7104 EFIS: 0400000160 COOP: 042550 |
---|---|
DIST-CO-RTE-PM | 04-ALA-880-28.4/29.2 |
Award Date | 04/30/2014 |
Closeout Date | 07/23/2020 |
Work Description | WIDEN ROADS, RECONSTRUCT RAMPS WITH HMA, REPLACE 2 CONC OVERCROSSINGS. |
Location Description | ALAMEDA COUNTY IN ALAMEDA AND OAKLAND FROM 0.2 MILE SOUTH OF 29TH AVENUE OVERCROSSING TO 0.3 MILE NORTH OF 23RD AVENUE OVERCROSSING. |
QA Service Level | 1 (Verified on 10/11/2013) |
Sample Information
Sample Taken Date | 01/24/2018 | Sample Unique Key | 4 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/26/2018 |
Sample type | Quality Assurance | A brief description of the sample | HRC 500 510 Couplers |
The quantity of what the sample constitutes | 4 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Rez | Last name of sampler or witnessed by | Zarnegar |
Title of sampler | Unknown | Telephone number of sampler | Unknown |
Laboratory sample identification | Unknown | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | HRC Gerdau Nucor | Transportation Laboratory (TL) Number | C690173 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | NA | Structure unique identifier | Not set |
Structure name | Not set |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | Nucor |
Coupler Manufacturer | HRC Gerdau | Intermediate Assembler or Fabricator | Unknown |
Rebar Size | #8 | Coupler Model | HRC 500-510 |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Unknown | Rebar Hoop Fabricator | Unknown |
Coupler Component Heat/Lot Number(s) | 58022038 | Rebar Heat Number(s) | SE17104912 |
Rebar Size 2 | Not set | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2018-01-24-4
DIME Test ID: 2018-01-24-4-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2018-02-02
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: Brian
Date of test: 01/26/2018
UTM: 400KIP
Halo ID: Small
Temperature: 72 F
Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|---|
1 | 2 | C12 | #8/25mm | 0.79 | 0 | 72530 | 91810 | Bar Broke,Ok Necking | Brian |
General comments (publicly viewable) (Max 1000 characters): Bar Broke,Ok Necking
Test Graph
Source: Partner Data Point FileTest graph for the Sample
Test was verified on 1/26/2018 ✔