Summary for Test 2018-01-01-10-5

Test performed: AASHTO T30-15

Project Information

Project IdentifiersProject ID: 99999
DEA: 0322222
DIST-CO-RTE-PM03-SAC,OMG-888,99,80-0.6-0.6
Award DateNot set
Closeout DateNot set
Work DescriptionTHIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES.
Location DescriptionTHIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES.
QA Service Level (Verified on 04/05/2013)

Sample Information

Sample Taken Date01/01/2018 Sample Unique Key10
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/01/2018
Sample typeQuality Control A brief description of the sample3/8-inch RAP
The quantity of what the sample constitutesJMF Verification From where was the sample collectedManufacturer
First name of sampler or witnessed bya Last name of sampler or witnessed bya
Title of samplerUnknown Telephone number of samplerUnknown
Laboratory sample identification3512 17-02-S1b Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameSNC - Mustang Asphalt Plant Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceMustang Asphalt Plant
Aggregate Size3/8-inch Aggregate SourceUnknown
RAP StockpileStatic Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2018-01-01-10
DIME Test ID: 2018-01-01-10-5
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2018-01-16

Test Results


Input Type: Calculated
Tester's full name: Ward Jenkins
Date of test: 01/01/2018
Cumulative percent passing the 2 in. sieve: no data
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 99.8 %
Cumulative percent passing the 3/8 in. sieve: 94 %
Cumulative percent passing the 1/4 in. sieve: 80 %
Cumulative percent passing the #4 sieve: 66 %
Cumulative percent passing the #8 sieve: 46.5 %
Cumulative percent passing the #16 sieve: 34.9 %
Cumulative percent passing the #30 sieve: 27.1 %
Cumulative percent passing the #50 sieve: 20.2 %
Cumulative percent passing the #100 sieve: 14.2 %
Cumulative percent passing the #200 sieve: 10 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/9/2018