Summary for Test 2017-10-31-2-2
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 211260 DEA: 072159U4 EFIS: 0715000160 |
---|---|
DIST-CO-RTE-PM | 07-LA,ORA-5-0.0/1.5, 44.3/44.4 |
Award Date | 05/27/2016 |
Closeout Date | 08/01/2023 |
Work Description | CONSTRUCT HOV LANES AND MIX FLOW LANES. |
Location Description | LOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK |
QA Service Level | 1 (Verified on 03/16/2016) |
Sample Information
Sample Taken Date | 10/31/2017 | Sample Unique Key | 2 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/03/2017 |
Sample type | Quality Assurance | A brief description of the sample | HRC 500 Couplers |
The quantity of what the sample constitutes | 1 lot | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | Russell | Last name of sampler or witnessed by | Lynch |
Title of sampler | QAI | Telephone number of sampler | Unknown |
Laboratory sample identification | Unknown | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Integrity Rebar | Transportation Laboratory (TL) Number | 941303 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | L96-200-17 | Structure unique identifier | Not set |
Structure name | Not set |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | Gerdau |
Coupler Manufacturer | Nucor | Intermediate Assembler or Fabricator | Unknown |
Rebar Size | #7 | Coupler Model | HRC 500/510 |
Coating Standards | Uncoated | Shape of Rebar | Hoop |
Rebar Hoop Diameter | Unknown | Rebar Hoop Fabricator | Integrity Rebar Placers |
Coupler Component Heat/Lot Number(s) | NF100886990 | Rebar Heat Number(s) | 65022421 |
Rebar Size 2 | Not set | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2017-10-31-2
DIME Test ID: 2017-10-31-2-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2017-11-13
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: Brian
Date of test: 11/06/2017
UTM: 400KIP
Halo ID: Small
Temperature: 72 F
Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|---|
1 | 2 | 1 | #7/22mm | 0.6 | 0 | 55755 | 92925 | Ok Necking | Brian |
General comments (publicly viewable) (Max 1000 characters): Ok Necking
Test Graph
Source: Partner Data Point FileTest graph for the Sample
Test was verified on 11/6/2017 ✔