Summary for Test 2024-12-10-45-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 212720
DEA: 07291404
EFIS: 0712000094
DIST-CO-RTE-PM07-LA-1-55-58
Award Date02/18/2021
Closeout DateNot set
Work DescriptionTRANCAS CREEK BRIDGE REPLACEMENT
Location DescriptionIN LOS ANGELES IN CITY OF MALIBU AT TRANCAS CREEK BRIDGE (53-0027).
QA Service Level1 (Verified on 04/02/2021)

Sample Information

Sample Taken Date12/10/2024 Sample Unique Key45
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/10/2024
Sample typeAcceptance A brief description of the sampleEmbankment
The quantity of what the sample constitutes24 cy From where was the sample collectedJob Site
First name of sampler or witnessed byLou Ralph Last name of sampler or witnessed byAchuela
Title of samplerTET Telephone number of sampler2138170504
Laboratory sample identification24-3820 Linked DIME Sample ID
The fabricator/manufacturer/facility nameStacy Witbeck Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleEmbankment
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedFrom various locations at Embankment
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2024-12-10-45
DIME Test ID: 2024-12-10-45-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-12-16

Test Results


Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Lou Ralph Achuela
Date of test: 12/10/2024
Gage No.: 31104
Test No.: 2
Nuclear By: Lou Ralph Achuela
Non-Bias Plan No.: 2
Depth: 7''
Material No.: On-Site
Material Type: Embankment
Impact By: Lou Ralph Achuela
Standard Count Density: 1987 g/cc
Count or Density 1: 2.21 g/cc
Count or Density 2: 2.31 g/cc
Count or Density 3: 2.26 g/cc
Standard Count Moisture: 669 g/cc
Moisture Count 1: 0.15 g/cc
Moisture Count 2: 0.14 g/cc
Moisture Count 3: 0.12 g/cc
Sum of Count or Density: 6.78 g/cc
Average of Count or Density: 2.26 g/cc
Sum of Moisture Count: 0.41 g/cc
Average of Moisture Count: 0.14 g/cc
Calculated Percent Relative Compaction: 97 %
Reported Percent Relative Compaction: 97 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/16/2024