Summary for Test 2024-11-01-69-1
Test performed: CTM 521-June 2020Project Information
Project Identifiers | Project ID: 994976 DEA: 060X3304 EFIS: 0618000055 |
---|---|
DIST-CO-RTE-PM | 06-KER-5-R0.0/4.4 |
Award Date | 10/23/2023 |
Closeout Date | Not set |
Work Description | REPLACE ROADWAY PAVEMENT WITH HMA AND CONCRETE. |
Location Description | KERN COUNTY AT AND NEAR LEBEC FROM LOS ANGELES COUNTY LINE TO GRAPEVINE CREEK |
QA Service Level | 1 (Verified on 07/27/2023) |
Sample Information
Sample Taken Date | 11/01/2024 | Sample Unique Key | 69 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/02/2024 |
Sample type | Acceptance | A brief description of the sample | JPCP- cylinders |
The quantity of what the sample constitutes | 1200-1500CY | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Neale | Last name of sampler or witnessed by | Brown |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | SPCI onsite | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | G3-18-PCC-128R |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 128 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Back of Truck | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2024-11-01-69
DIME Test ID: 2024-11-01-69-1
Testing Lab: CT D06 - Bakersfield Field Laboratory
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2024-12-13
Test Results
Unit system used?: US Units
Number of specimens: 3
Test performed: With no density determined
Input Type: Measured
Tester's full name: Mike Cozad
Date of test: 12/13/2024
Capped in accordance with?: ASTM C617 - Sulfur Mortar Cap
Average diameter of cylinder 1: 4.00 in
Average diameter of cylinder 2: 4.00 in
Average diameter of cylinder 3: 4.01 in
Maximum load on cylinder 1: 76950 lb
Maximum load on cylinder 2: 74620 lb
Maximum load on cylinder 3: 79100 lb
Type of fracture pattern of cylinder 1: 2
Type of fracture pattern of cylinder 2: 4
Type of fracture pattern of cylinder 3: 2
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1.00
Correction factor for cylinder 2: 1.00
Correction factor for cylinder 3: 1.00
Age of specimen: 42 days
Age of specimen in hours: 0 hours
Cross sectional area of cylinder 1: 12.57 in^2
Cross sectional area of cylinder 2: 12.57 in^2
Cross sectional area of cylinder 3: 12.63 in^2
Compressive strength of cylinder 1: 6,121.7 psi
Compressive strength of cylinder 2: 5,936.4 psi
Compressive strength of cylinder 3: 6,262.9 psi
Compressive strength (to nearest 10 psi): 6110 psi
General comments (publicly viewable) (Max 1000 characters): initial cure temperature not comply with test method
Test File Attachments
File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
---|---|---|---|---|---|
06-0X3304_37049_241101_20_42D | 111.72 KB | 12/13/2024 | 2024-11-01-69-1 | Info |
Test was verified on 12/13/2024 ✔