Summary for Test 2024-11-01-68-1
Test performed: CTM 521-June 2020Project Information
| Project Identifiers | Project ID: 994976 DEA: 060X3304 EFIS: 0618000055 |
|---|---|
| DIST-CO-RTE-PM | 06-KER-5-R0.0/4.4 |
| Award Date | 10/23/2023 |
| Closeout Date | Not set |
| Work Description | REPLACE ROADWAY PAVEMENT WITH HMA AND CONCRETE. |
| Location Description | KERN COUNTY AT AND NEAR LEBEC FROM LOS ANGELES COUNTY LINE TO GRAPEVINE CREEK |
| QA Service Level | 1 (Verified on 07/27/2023) |
Sample Information
| Sample Taken Date | 11/01/2024 | Sample Unique Key | 68 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/02/2024 |
| Sample type | Acceptance | A brief description of the sample | JPCP- cylinders |
| The quantity of what the sample constitutes | 900-1200CY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Neale | Last name of sampler or witnessed by | Brown |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | SPCI onsite | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | G3-18-PCC-128R |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 103 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Back of Truck | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2024-11-01-68
DIME Test ID: 2024-11-01-68-1
Testing Lab: CT D06 - Bakersfield Field Laboratory
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2024-12-13
Test Results
Unit system used?: US Units
Number of specimens: 3
Test performed: With no density determined
Input Type: Measured
Tester's full name: Kulwinder Rai
Date of test: 12/13/2024
Capped in accordance with?: ASTM C617 - Sulfur Mortar Cap
Average diameter of cylinder 1: 3.99 in
Average diameter of cylinder 2: 4.00 in
Average diameter of cylinder 3: 4.00 in
Maximum load on cylinder 1: 75450 lb
Maximum load on cylinder 2: 74630 lb
Maximum load on cylinder 3: 74290 lb
Type of fracture pattern of cylinder 1: 3
Type of fracture pattern of cylinder 2: 2
Type of fracture pattern of cylinder 3: 2
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1.00
Correction factor for cylinder 2: 1.00
Correction factor for cylinder 3: 1.00
Age of specimen: 42 days
Age of specimen in hours: 0 hours
Cross sectional area of cylinder 1: 12.5 in^2
Cross sectional area of cylinder 2: 12.57 in^2
Cross sectional area of cylinder 3: 12.57 in^2
Compressive strength of cylinder 1: 6036.0 psi
Compressive strength of cylinder 2: 5937.2 psi
Compressive strength of cylinder 3: 5910.1 psi
Compressive strength (to nearest 10 psi): 5960 psi
General comments (publicly viewable) (Max 1000 characters): initial cure temperature not comply with test method
Test File Attachments
| File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|---|
| 06-0X3304_37049_241101_19_42D | 111.89 KB | 12/13/2024 | 2024-11-01-68-1 | Info |
Test was verified on 12/13/2024 ✔
