Summary for Test 2024-09-19-71-1
Test performed: AASHTO T27-14Project Information
| Project Identifiers | Project ID: 994226 DEA: 042K7004 EFIS: 0417000010 COOP: 042895 |
|---|---|
| DIST-CO-RTE-PM | 04-ALA-880-R0.0/11.8 |
| Award Date | 07/13/2023 |
| Closeout Date | Not set |
| Work Description | Cold plane pavement and overlay with RHMA-G/RHMA-O (CAPITAL PREVENTIVE MAINTENANCE) |
| Location Description | ALAMEDA COUNTY IN FREMONT AND NEWARK FROM SANTA CLARA COUNTY LINE TO 0.4 MILE NORTH OF FREMONT BOULEVARD OVERCROSSING |
| QA Service Level | 1 (Verified on 09/13/2022) |
Sample Information
| Sample Taken Date | 09/19/2024 | Sample Unique Key | 71 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/18/2024 |
| Sample type | Quality Assurance | A brief description of the sample | 3/4 RHMA-G |
| The quantity of what the sample constitutes | 750 Tons | From where was the sample collected | Supplier |
| First name of sampler or witnessed by | Magana | Last name of sampler or witnessed by | Luis |
| Title of sampler | Telephone number of sampler | 2092250104 | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Vulcan Materials-Pleasanton | Transportation Laboratory (TL) Number | C690435 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-01-0010 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Plant Sampler | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
| The concrete mix design number | Lot number | 1 | |
| Sublot number | 15 | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-09-19-71
DIME Test ID: 2024-09-19-71-1
Testing Lab: CT D04 - Hayward Field Laboratory
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Test Release Date: 2024-10-02
Test Results
What type of gradation is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Does this test use 1/4 sieve? (question for HMA Gradation Type): Yes
Has the fine aggregate sample been reduced?: Yes
Input Type: Calculated
Tester's full name: Luis Magana
Date of test: 09/20/2024
| Cumulative Percent Passing | ||||||
|---|---|---|---|---|---|---|
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 97 % | ||||||
| 79 % | ||||||
| 67 % | ||||||
| 42 % | ||||||
| 22 % | ||||||
| 13 % | ||||||
| 9 % | ||||||
| 6 % | ||||||
| 3 % | ||||||
| 2.4 % | ||||||
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/2/2024 ✔
