Summary for Test 2024-07-05-6-2

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 993333
DEA: 04264724
EFIS: 0419000068
DIST-CO-RTE-PM04-MRN-101-R20.8/27.1
Award Date04/26/2022
Closeout DateNot set
Work DescriptionCIP BRIDGES, CONSTRUCT ROADWAY, RETAINING WALLS AND MODIFY ELECTRICAL.
Location DescriptionMARIN COUNTY IN AND NEAR NOVATO FROM 0.1 MILE SOUTH OF FRANKLIN AVENUE OVERHEAD TO 0.5 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE
QA Service Level1 (Verified on 11/01/2021)

Sample Information

Sample Taken Date07/05/2024 Sample Unique Key6
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/05/2024
Sample typeQuality Control A brief description of the sampleaggregate
The quantity of what the sample constitutes171CY From where was the sample collectedSupplier
First name of sampler or witnessed byRoland Last name of sampler or witnessed byOcansey
Title of samplerLab Technician Telephone number of sampler
Laboratory sample identification1-5 Linked DIME Sample ID
The fabricator/manufacturer/facility nameShamrock Materials Petaluma Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameRW#3

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Shamrock Materials Petaluma
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedplant
Where the material sample would have been placed if not sampledconcrete Primary Aggregate Nominal Size1 inch
The concrete mix design numberSL-4201CG Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2024-07-05-6
DIME Test ID: 2024-07-05-6-2
Testing Lab: Pavement Engineers
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2024-09-23

Test Results


Number of tests: 3
Input Type: Calculated
Tester's full name: Michelle Holub
Date of test: 07/08/2024
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 4.9
Sand reading (test 1): 4
Clay reading (test 2): 4
Sand reading (test 2): 3.3
Clay reading (test 3): 5.2
Sand reading (test 3): 4.3
Sand equivalent (test 1): 82
Sand equivalent (test 2): 83
Sand equivalent (test 3): 83
Sand equivalent before temperature correction: 83
Sand equivalent after temperature correction: 83
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/23/2024