Summary for Test 2024-05-23-110-1
Test performed: CTM 226-July 2010Project Information
Project Identifiers | Project ID: 209698 DEA: 072332E4 EFIS: 0700000391 COOP: 0705187 |
---|---|
DIST-CO-RTE-PM | 07-LA-I-5-45.4/54 |
Award Date | 07/01/2021 |
Closeout Date | Not set |
Work Description | Addition of 14 miles of HOV lanes in both directions would extend existing carpool lanes on the I- 5 in San Fernando Valley to Santa Clarita Valley |
Location Description | The I-5 North Capacity Enhancements Project focuses on improvements to the I-5 freeway from cities of Santa Clarita and Castaic, beginning at the SR-14 interchange to Parker Rd. |
QA Service Level | 2 (Verified on 02/03/2021) |
Sample Information
Sample Taken Date | 05/23/2024 | Sample Unique Key | 110 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/23/2024 |
Sample type | Quality Control | A brief description of the sample | 1x4 concrete aggregates |
The quantity of what the sample constitutes | 1 per batch | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Angel | Last name of sampler or witnessed by | Zuniga |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | National Ready Mix - Santa Clarita | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-19-0046 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | stockpile or belt cut | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-05-23-110
DIME Test ID: 2024-05-23-110-1
Testing Lab: Sequoia Consultants
Test Method: CTM 226-July 2010: Method of Test for Determination of Moisture Content of Soils and Aggregates by Oven Drying
Test Release Date: 2024-09-20
Test Results
Input Type: Calculated
Tester's full name: Axel Ortega
Date of test: 05/24/2024
Wet weight of the sample: 1000.0000000000 grams
Dry weight of the sample: 950.0000000000 grams
Weight of water in sample: 50.0000000000 grams
Percent moisture: 5 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/20/2024 ✔