Summary for Test 2024-08-01-175-2

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 993333
DEA: 04264724
EFIS: 0419000068
DIST-CO-RTE-PM04-MRN-101-R20.8/27.1
Award Date04/26/2022
Closeout DateNot set
Work DescriptionCIP BRIDGES, CONSTRUCT ROADWAY, RETAINING WALLS AND MODIFY ELECTRICAL.
Location DescriptionMARIN COUNTY IN AND NEAR NOVATO FROM 0.1 MILE SOUTH OF FRANKLIN AVENUE OVERHEAD TO 0.5 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE
QA Service Level1 (Verified on 11/01/2021)

Sample Information

Sample Taken Date08/01/2024 Sample Unique Key175
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/01/2024
Sample typeAcceptance A brief description of the sampleSBFL
The quantity of what the sample constitutes600 sqft From where was the sample collectedJob Site
First name of sampler or witnessed byAnthony Last name of sampler or witnessed byValdez
Title of sampler Telephone number of sampler
Laboratory sample identificationPet-24-375 Linked DIME Sample ID
The fabricator/manufacturer/facility nameRoadway ex Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameDS-27

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedDS-27
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2024-08-01-175
DIME Test ID: 2024-08-01-175-2
Testing Lab: CT D04 - Petaluma Field Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-09-19

Test Results


Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Anthony Valdez
Date of test: 08/01/2024
Sum of Count or Density: 76221 g/cc
Average of Count or Density: 25407 g/cc
Sum of Moisture Count: 7250 g/cc
Average of Moisture Count: 2417 g/cc
Count Ratio Density: 2.23
Count Ratio Moisture: 0.2
Calculated Percent Relative Compaction: 97 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/19/2024