Summary for Test 2024-08-20-87-1
Test performed: CTM 231-March 2013Project Information
Project Identifiers | Project ID: 215220 DEA: 07210624 EFIS: 0719000068 |
---|---|
DIST-CO-RTE-PM | 07-LA,SBD-71-1.8/R4.7&R0.0/R0.2 |
Award Date | 02/05/2021 |
Closeout Date | Not set |
Work Description | PLACE STRUCTURE CONCRETE RETAINING WALLS & BOX CULVERT AND PLACE JPCP. |
Location Description | IN LOS ANGELES AND SAN BERNARDINO COUNTIES IN POMONA AND CHINO HILLS FROM 0.2 MILE SOUTH OF MISSION BOULEVARD OVERCROSSING TO 0.2 MILE OF SAN BERNARDINO COUNTY LINE. |
QA Service Level | 1 (Verified on 03/24/2021) |
Sample Information
Sample Taken Date | 08/20/2024 | Sample Unique Key | 87 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/20/2024 |
Sample type | Quality Assurance | A brief description of the sample | Native Material |
The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Source |
First name of sampler or witnessed by | Fernando | Last name of sampler or witnessed by | Carranza |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 24-2557 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | N/A | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | N/A |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | CTM 231 Test Holes | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/8 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-08-20-87
DIME Test ID: 2024-08-20-87-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-09-11
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Fernando Carranza
Date of test: 08/20/2024
Gage No.: no data
Test No.: no data
Nuclear By: no data
Non-Bias Plan No.: no data
Depth: no data
Material No.: no data
Material Type: no data
Impact By: no data
Standard Count Density: 2446 g/cc
Count or Density 1: 516 g/cc
Count or Density 2: 573 g/cc
Count or Density 3: 529 g/cc
Standard Count Moisture: 780 g/cc
Moisture Count 1: 137 g/cc
Moisture Count 2: 169 g/cc
Moisture Count 3: 155 g/cc
Sum of Count or Density: 1618 g/cc
Average of Count or Density: 539.33 g/cc
Sum of Moisture Count: 461 g/cc
Average of Moisture Count: 153.67 g/cc
Calculated Percent Relative Compaction: 89.9 %
Reported Percent Relative Compaction: 90 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/11/2024 ✔