Summary for Test 2024-07-09-126-1
Test performed: CTM 524-March 2013Project Information
Project Identifiers | Project ID: 994966 DEA: 073255U4 EFIS: 0722000129 |
---|---|
DIST-CO-RTE-PM | 07-LA-605-20.2/26 |
Award Date | 04/12/2023 |
Closeout Date | Not set |
Work Description | INDIVIDUAL SLAB REPLACEMENT, COLD PLANE AC |
Location Description | LOS ANGELES COUNTY IN BALDWIN PARK AND IRWINDALE FROM ROUTE 10/605 SEPARATION TO 0.2 MILE NORTH OF ROUTE 210/605 SEPARATION |
QA Service Level | 1 (Verified on 07/13/2023) |
Sample Information
Sample Taken Date | 07/09/2024 | Sample Unique Key | 126 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/29/2024 |
Sample type | Quality Assurance | A brief description of the sample | A set of 3 JPCP RSC beams |
The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Source |
First name of sampler or witnessed by | Jeffrey | Last name of sampler or witnessed by | Diaz |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 24-1682 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | N/A | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | CTS-65-EH |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 3 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | wheelbarrow | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2024-07-09-126
DIME Test ID: 2024-07-09-126-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete
Test Release Date: 2024-08-09
Test Results
Number of specimens: 3
Does the testing machine measure load or stress on the beam specimen?: Stress
Fracture initiates in the tension surface: Within the Middle Third of the Span Length
Fracture occurred at a capped section: No
Is a beam dimensional correction factor used?: Yes
Input Type: Measured
Tester's full name: Jeffrey Diaz
Date of test: 07/09/2024
Identification number: 24-1682
Width of specimen: 6.0625 inch
Width of specimen 2: 6.0625 inch
Width of specimen 3: 6.25 inch
Depth of specimen: 6.0625 inch
Depth of specimen 2: 6 inch
Depth of specimen 3: 6 inch
Span length of specimen: 18 inch
Span length of specimen 2: 18 inch
Span length of specimen 3: 18 inch
Maximum recording: 650 psi
Maximum recording 2: 675 psi
Maximum recording 3: 650 psi
Correction Factor: 0.97
Correction Factor 2: 0.98
Correction Factor 3: 0.96
Curing history and apparent moisture condition of the specimen: Sand
If specimen was capped, ground or if leather shims were used: No
Defects in specimen, including numbers of beams discarded during test: No
Age of specimen: 10 days
Age of specimen in hours: no data
Modulus of rupture: 660 psi
Modulus of rupture 2: 690 psi
Modulus of rupture 3: 660 psi
Modulus of rupture average: 670 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/9/2024 ✔