Summary for Test 2024-07-19-7-1
Test performed: CTM 231-March 2013Project Information
Project Identifiers | Project ID: 215220 DEA: 07210624 EFIS: 0719000068 |
---|---|
DIST-CO-RTE-PM | 07-LA,SBD-71-1.8/R4.7&R0.0/R0.2 |
Award Date | 02/05/2021 |
Closeout Date | Not set |
Work Description | PLACE STRUCTURE CONCRETE RETAINING WALLS & BOX CULVERT AND PLACE JPCP. |
Location Description | IN LOS ANGELES AND SAN BERNARDINO COUNTIES IN POMONA AND CHINO HILLS FROM 0.2 MILE SOUTH OF MISSION BOULEVARD OVERCROSSING TO 0.2 MILE OF SAN BERNARDINO COUNTY LINE. |
QA Service Level | 1 (Verified on 03/24/2021) |
Sample Information
Sample Taken Date | 07/19/2024 | Sample Unique Key | 7 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/19/2024 |
Sample type | Acceptance | A brief description of the sample | AB Compaction test on A1 line sta.147+00-148+50 w/ 45' wide for test#7 |
The quantity of what the sample constitutes | 750 sy | From where was the sample collected | Source |
First name of sampler or witnessed by | Sopheak | Last name of sampler or witnessed by | Chong |
Title of sampler | TEC | Telephone number of sampler | 2138170174 |
Laboratory sample identification | 24-2081 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | OHL USA | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name | AB Compaction test on A1 line sta.147+00-148+50 w/ 45' wide for test#7 |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | Aggregate Base |
---|---|---|---|
The fabricator/manufacturer designation for the sample | various location A.B | A detailed description of where the material sample was collected | Jobsite |
Where the material sample would have been placed if not sampled | Jobsite |
Test Details
DIME Sample ID: 2024-07-19-7
DIME Test ID: 2024-07-19-7-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-08-13
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Sopheak Chong
Date of test: 07/19/2024
Gage No.: 60137
Test No.: 1
Nuclear By: Sopheak Chong
Non-Bias Plan No.: 2
Depth: 7''
Material No.: Aggregate Base
Material Type: Aggregate Base
Impact By: Sopheak Chong
Standard Count Density: 2192 g/cc
Count or Density 1: 2.08 g/cc
Count or Density 2: 2.08 g/cc
Count or Density 3: 2.11 g/cc
Standard Count Moisture: 651 g/cc
Moisture Count 1: 0.12 g/cc
Moisture Count 2: 0.14 g/cc
Moisture Count 3: 0.14 g/cc
Sum of Count or Density: 6.27 g/cc
Average of Count or Density: 2.09 g/cc
Sum of Moisture Count: 0.40 g/cc
Average of Moisture Count: 0.13 g/cc
Calculated Percent Relative Compaction: 96.3 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/13/2024 ✔