Summary for Test 2024-06-01-3-1
Test performed: CTM 231-March 2013Project Information
Project Identifiers | Project ID: 995085 DEA: 07322904 EFIS: 0716000059 |
---|---|
DIST-CO-RTE-PM | 07-LA-27-0.0/18.6 |
Award Date | 11/06/2023 |
Closeout Date | Not set |
Work Description | REMOVE EXISTING AC PAVEMENT & HMA OVERLAY. |
Location Description | LOS ANGELES COUNTY IN AND NEAR LOS ANGELES FROM ROUTE 1 TO DEVONSHIRE STREET |
QA Service Level | 1 (Verified on 09/11/2023) |
Sample Information
Sample Taken Date | 06/01/2024 | Sample Unique Key | 3 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/01/2024 |
Sample type | Quality Assurance | A brief description of the sample | Native Soil |
The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Source |
First name of sampler or witnessed by | Kreetha | Last name of sampler or witnessed by | Mekchai |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 24-1234 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | N/A | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | N/A |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | CTM 231 Test Holes | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/8 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-06-01-3
DIME Test ID: 2024-06-01-3-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-06-21
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Kreetha Mekchai
Date of test: 06/01/2024
Gage No.: no data
Test No.: no data
Nuclear By: no data
Non-Bias Plan No.: no data
Depth: no data
Material No.: no data
Material Type: no data
Impact By: no data
Standard Count Density: 2992 g/cc
Count or Density 1: 5669 g/cc
Count or Density 2: 5539 g/cc
Count or Density 3: 5476 g/cc
Standard Count Moisture: 1074 g/cc
Moisture Count 1: 432 g/cc
Moisture Count 2: 328 g/cc
Moisture Count 3: 271 g/cc
Sum of Count or Density: 16684 g/cc
Average of Count or Density: 5561.33 g/cc
Sum of Moisture Count: 1031 g/cc
Average of Moisture Count: 343.67 g/cc
Calculated Percent Relative Compaction: 94.8 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/21/2024 ✔