Summary for Test 2024-05-03-28-6
Test performed: CTM 207-March 2012Project Information
Project Identifiers | Project ID: 66666 DEA: APP EFIS: 0019000052 |
---|---|
DIST-CO-RTE-PM | 59--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Special project for submitting Sample information for Aggregate Pre-approval Program (APP). Object Code: 1025. J2 DEA: 912680. |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 05/03/2024 | Sample Unique Key | 28 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 05/06/2024 |
Sample type | Aggregate Prequalification Program | A brief description of the sample | WCS |
The quantity of what the sample constitutes | 5 Buckets | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Eduardo | Last name of sampler or witnessed by | Cuevas |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | 2024-05-03-21 | |
The fabricator/manufacturer/facility name | Holliday Rock Co. Inc. | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-36-0006 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Stockpile | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | fine | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-05-03-28
DIME Test ID: 2024-05-03-28-6
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 207-March 2012: Method of Test for Specific Gravity and Absorption of Fine Aggregate
Test Release Date: 2024-06-06
Test Results
Input Type: Calculated
Tester's full name: Friday Ofoegbu
Date of test: 05/25/2024
% Absorption: 1.5 %
Specific Gravity: 2.66
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/6/2024 ✔