Summary for Test 2024-05-15-82-1

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 994773
DEA: 081C7704
EFIS: 0813000017
DIST-CO-RTE-PM08-SBD-15-80.6,R119.1
Award Date06/20/2023
Closeout DateNot set
Work DescriptionCAST-IN-DRILLED-HOLE CONC PILE, FURNISH & INSTALL SIGN STR, AND MGS.
Location DescriptionSAN BERNARDINO COUNTY NEAR BARSTOW AT 1.2 MILES SOUTH OF GHOST TOWN ROAD AND AT 1.4 MILES SOUTH OF BASIN ROAD
QA Service Level1 (Verified on 08/15/2023)

Sample Information

Sample Taken Date05/15/2024 Sample Unique Key82
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/15/2024
Sample typeAcceptance A brief description of the sample1 x 4 PCC Aggregates
The quantity of what the sample constitutes 3 Bags From where was the sample collectedManufacturer
First name of sampler or witnessed byFrancisco Last name of sampler or witnessed byRuvalcaba
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameHiGrade Oro Grande Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-36-0046
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedAt the plant
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1 inch
The concrete mix design numberHG98537S Lot number
Sublot number Aggregate Mix Number

Combined Gradation Report Information

Combined Gradation Report IdBin IndexDime Test Id
No assigned tests for this sample.

Test Details

DIME Sample ID: 2024-05-15-82
DIME Test ID: 2024-05-15-82-1
Testing Lab: CT D08 - Barstow Field Laboratory 1
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2024-06-03

Test Results


What size aggregate is being tested?: 1 in. x No. 4 - Coarse Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Chizitere Ozuruigbo
Date of test: 05/20/2024
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 97 %
Cumulative percent passing the 3/4 in. sieve: 69 %
Cumulative percent passing the 1/2 in. sieve: 0 %
Cumulative percent passing the 3/8 in. sieve: 20 %
Cumulative percent passing the #4 sieve: 5 %
Cumulative percent passing the #8 sieve: 2 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/3/2024