Summary for Test 2024-05-21-55-3

Test performed: AASHTO T308-10

Project Information

Project IdentifiersProject ID: 209820
DEA: 04297634
EFIS: 0415000040
COOP: 042548
DIST-CO-RTE-PM04-ALA-84,680-17.9/21
Award Date02/19/2021
Closeout DateNot set
Work DescriptionROUTE 84 WIDENING (4-LANE EXPRESSWAY) FROM I-680 TO PIGEON PASS, INCLUDING INTERSECTION, DRAINAGE IMPROVEMENTS AND UTILITY RELOCATION.
Location DescriptionALAMEDA COUNTY IN AND NEAR SUNOL, PLEASANTON, AND LIVERMORE ON ROUTE 84 FROM 0.1 MILE EAST OF ROUTE 680 TO 0.1 MILE SOUTH OF RUBY HILL DRIVE AND ON ROUTE 680 FROM 1.2 MILES SOUTH TO 1.8 MILES NORTH OF ROUTE 84
QA Service Level1 (Verified on 11/04/2019)

Sample Information

Sample Taken Date05/21/2024 Sample Unique Key55
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/23/2024
Sample typeQuality Assurance A brief description of the sample3/4 HMA-SP Type A
The quantity of what the sample constitutes750 Tons From where was the sample collectedSource
First name of sampler or witnessed byMond Last name of sampler or witnessed byOsawaru
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameVulcan Pleasanton Transportation Laboratory (TL) NumberC031265
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number13
Sublot number1 HMA Mix Number220304

Test Details

DIME Sample ID: 2024-05-21-55
DIME Test ID: 2024-05-21-55-3
Testing Lab: CT D04 - Pleasanton Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2024-05-23

Test Results


What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Robert Lohman
Date of test: 05/23/2024
Test procedure used?: Method A
Mass of the specimen basket assembly: 2895.1 g
Mass of the specimen and specimen basket assembly prior to ignition: 4931.2 g
Mass of HMA Sample prior to ignition: 2036.1 g
Mass Loss: 129.4 g
Mass of aggregate remaining after ignition: 1906.7 g
Correction Factor (Percent by mass of HMA Specimen): 1.19 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.14 %
Test Temperature: 482 C
Corrected Asphalt Binder Content: 5.03 %
General comments (publicly viewable) (Max 1000 characters): Lot 13 Sublot 3

Test was verified on 5/23/2024