Summary for Test 2017-04-13-5-1
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 210886 DEA: 050F7004 EFIS: 0500000049 |
---|---|
DIST-CO-RTE-PM | 05-MON-68-R17.4/R18.0 |
Award Date | 01/22/2016 |
Closeout Date | 12/30/2019 |
Work Description | WIDENING BRIDGE |
Location Description | IN MONTEREY COUNTY ON ROUTE 68 NEARSALINAS FROM 0.2 MILE EAST OFRESERVATION ROAD UNDERCROSSING TO SPRECKELS BOULEVARD UNDERCROSSING |
QA Service Level | 1 (Verified on 02/01/2016) |
Sample Information
Sample Taken Date | 04/13/2017 | Sample Unique Key | 5 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/13/2017 |
Sample type | Quality Assurance | A brief description of the sample | Bartec Couplers |
The quantity of what the sample constitutes | 4 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Jason | Last name of sampler or witnessed by | Wilcox |
Title of sampler | Unknown | Telephone number of sampler | Unknown |
Laboratory sample identification | Unknown | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Harris Rebar Dextra Nucor | Transportation Laboratory (TL) Number | C680515 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | NA | Structure unique identifier | Not set |
Structure name | Not set |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Service | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | Nucor |
Coupler Manufacturer | Dextra America | Intermediate Assembler or Fabricator | Unknown |
Rebar Size | #6 | Coupler Model | Threaded |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Unknown | Rebar Hoop Fabricator | Unknown |
Coupler Component Heat/Lot Number(s) | DL14103837, 3724 | Rebar Heat Number(s) | SE16105304 |
Rebar Size 2 | Not set | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2017-04-13-5
DIME Test ID: 2017-04-13-5-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2017-04-25
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: Fred
Date of test: 04/18/2017
UTM: 75KIP
Halo ID: Small
Temperature: 72 F
Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|---|
1 | 1 | C02 | #6/19mm | 0.44 | -0.0007 | 43298 | 98405 | Service Splice | Fred |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Partner Data Point FileTest graph for the Sample
Test was verified on 4/18/2017 ✔