Summary for Test 2016-12-16-13-1
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 7285 DEA: 040120T4 EFIS: 0400000027 |
---|---|
DIST-CO-RTE-PM | 04-SF-80-12.6/13.9 |
Award Date | 11/27/2012 |
Closeout Date | Not set |
Work Description | CONSTRUCT BRIDGE, ROADWAYS, ELECTRICAL, BUILDINGS AND REMOVE BRIDGES |
Location Description | THE CITY AND COUNTY OF SAN FRANCISCO FROM THE YERBA BUENA TUNNEL TO 1.3 KM EAST OF THE YERBA BUENA TUNNEL |
QA Service Level | 1 (Verified on 10/29/2012) |
Sample Information
Sample Taken Date | 12/16/2016 | Sample Unique Key | 13 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/02/2017 |
Sample type | Quality Assurance | A brief description of the sample | 14 Rebar Couplers |
The quantity of what the sample constitutes | 4 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Carlos | Last name of sampler or witnessed by | Tongson |
Title of sampler | Unknown | Telephone number of sampler | Unknown |
Laboratory sample identification | Unknown | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | CMC Rebar, HRC | Transportation Laboratory (TL) Number | C625548 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | Not set |
Structure name | Not set |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Service | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | CMC Rebar |
Coupler Manufacturer | HRC | Intermediate Assembler or Fabricator | Unknown |
Rebar Size | 14 | Coupler Model | 500 510 |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Unknown | Rebar Hoop Fabricator | Unknown |
Coupler Component Heat/Lot Number(s) | 498054 232355 | Rebar Heat Number(s) | 6501836103 |
Rebar Size 2 | Not set | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2016-12-16-13
DIME Test ID: 2016-12-16-13-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2017-02-09
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: Brian / Fred
Date of test: 02/02/2017
UTM: 2000KIP
Halo ID: Big
Temperature: 72 F
Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|---|
1 | 1 | 1 | #14/43mm | 2.25 | -0.0081 | 217238 | 96550 | necking okay | Brian / Fred |
General comments (publicly viewable) (Max 1000 characters): necking okay
Test Graph
WARNING: No graph data imported from Instron machine.
Test was verified on 2/2/2017 ✔