Work DescriptionROADWAY EXCAVATION, HOT MIX ASPHALT, AND STRUCTURAL SHOTCRETE WALLS.
Location DescriptionRIVERSIDE COUNTY NEAR LAKE ELSINORE FROM ORANGE COUNTY LINE TO MONTE VISTA STREET
QA Service Level1 (Verified on 02/24/2021)

Sample Information

Sample Taken Date06/25/2023 Sample Unique Key19
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/26/2023
Sample typeQuality Assurance A brief description of the sample3/4" HMA A
The quantity of what the sample constitutes1 bag From where was the sample collectedManufacturer
First name of sampler or witnessed byJulius Last name of sampler or witnessed byE
Title of samplerTET Telephone number of sampler
Laboratory sample identificationtest 31595 tons out at 0235pM Linked DIME Sample ID
The fabricator/manufacturer/facility nameBlue Diamond LakeElsino Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number1
Sublot number51 HMA Mix Number

Test Details

DIME Sample ID: 2023-06-25-19
DIME Test ID: 2023-06-25-19-1
Testing Lab: CT D08 - Blythe Field Testing Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2023-06-30

Test Results


Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: francisco Ruvaicaba Jr.
Date of test: 06/27/2023
Cumulative percent passing the 2 in. sieve: 0 %
Cumulative percent passing the 1 1/2 in. sieve: 0 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 96 %
Cumulative percent passing the 1/2 in. sieve: 77 %
Cumulative percent passing the 3/8 in. sieve: 63 %
Cumulative percent passing the #4 sieve: 45 %
Cumulative percent passing the #8 sieve: 34 %
Cumulative percent passing the #16 sieve: 24 %
Cumulative percent passing the #30 sieve: 17 %
Cumulative percent passing the #50 sieve: 12 %
Cumulative percent passing the #100 sieve: 8 %
Cumulative percent passing the #200 sieve: 4.8 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/30/2023