Summary for Test 2023-04-14-11-2
Test performed: CTM 217-June 2011Project Information
Project Identifiers | Project ID: 215396 DEA: 042K8404 EFIS: 0417000031 |
---|---|
DIST-CO-RTE-PM | 04-SOL-29,80-0.0,0.8/1.6 |
Award Date | 03/26/2021 |
Closeout Date | 02/16/2024 |
Work Description | HMA, STRUCTURAL CONCRETE, CIDH PILING AND REBAR. |
Location Description | SOLANO COUNTY IN VALLEJO AT ROUTE 80/29 SEPARATION AND ON ROUTE 80 FROM 0.2 MILE NORTH OF CARQUINEZ BRIDGE TOLL PLAZA TO 0.3 MILE SOUTH OF MAGAZINE STREET OVERCROSSING |
QA Service Level | 1 (Verified on 01/25/2021) |
Sample Information
Sample Taken Date | 04/14/2023 | Sample Unique Key | 11 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/14/2023 |
Sample type | Quality Assurance | A brief description of the sample | 1X4" PCC and Sand |
The quantity of what the sample constitutes | 2 bags | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Ignacio | Last name of sampler or witnessed by | Arechiga |
Title of sampler | QA Technician | Telephone number of sampler | 5102077252 |
Laboratory sample identification | Con_23_296 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Central Vallejo (Lake Herman) | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-48-0002 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | HWY 80/29 | The fabricator/manufacturer designation for the sample | |
The plant number | A detailed description of where the material sample was collected | Conveyor Belt | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
The concrete mix design number | D10115EA | Lot number | |
Sublot number | Aggregate Mix Number | D10115EA |
Test Details
DIME Sample ID: 2023-04-14-11
DIME Test ID: 2023-04-14-11-2
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2023-04-17
Test Results
Number of tests: 1
Input Type: Measured
Tester's full name: IGNACIO ARECHIGA
Date of test: 04/14/2023
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 5
Sand reading (test 1): 4.2
Sand equivalent (test 1): 84
Sand equivalent before temperature correction: 84
Sand equivalent after temperature correction: 84
General comments (publicly viewable) (Max 1000 characters): S.E
Test was verified on 4/17/2023 ✔