Summary for Test 2023-01-20-10-1

Test performed: CTM 518-June 2010

Project Information

Project IdentifiersProject ID: 993386
DEA: 060R1904
EFIS: 0614000057
COOP: 061783
DIST-CO-RTE-PM06-KER-184,223-L0.0/L0.3,R15.7/R16.3
Award Date01/25/2022
Closeout Date04/08/2024
Work DescriptionCONSTRUCT ROUNDABOUT, CURB RAMPS, AND LIGHTING SYSTEMS.
Location DescriptionKERN COUNTY NEAR ARVIN ON ROUTE 184 FROM ROUTE 223 TO 0.3 MILE NORTH OF ROUTE 223 AND ON ROUTE 223 FROM 0.3 MILE WEST OF ROUTE 184 TO 0.3 MILE EAST OF ROUTE 184
QA Service Level1 (Verified on 11/15/2021)

Sample Information

Sample Taken Date01/20/2023 Sample Unique Key10
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/20/2023
Sample typeQuality Assurance A brief description of the sampleJPCP concrete
The quantity of what the sample constitutes38 Cubic Yards From where was the sample collectedJob Site
First name of sampler or witnessed byNeale Last name of sampler or witnessed byBown
Title of samplerTester Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameGolden Empire - Bakersfield Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberND15518C
The truck number from where the sample was collected9187 load4 The batch plant ticket number from where the sample was collected207289730
Concrete batch plantGolden Empire Bakersfield The fabricator/manufacturer designation for the sample14 beams at jobsite 90 and 91
A detailed description of where the material sample was collectedBack of Truck Where the material sample would have been placed if not sampledPAVEMENT SLAB
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2023-01-20-10
DIME Test ID: 2023-01-20-10-1
Testing Lab: CT D06 - Bakersfield Field Laboratory
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Test Release Date: 2023-01-20

Test Results


Input Type: Measured
Tester's full name: Neale Brown
Date of test: 01/20/2023
Calibration factor: 4.01
Weight of (Measure + Concrete + Cover Plate): 45.56 lb
Weight of (Measure + Cover Plate): 8.53 lb
Total weight of cement: 6375 lb
Total weight of fine aggregate: 11767.8 lb
Total weight of coarse aggregate: 16880 lb
Total weight of water added during mixing: 2450.16 lb
Kelly Ball Penetration of the batch of concrete tested: 1.5 inch
Air content by the pressure method: 1.8 %
Station number or portion of the structure in which the concrete was placed: No station provided
Net weight of concrete: 37.03 lb
Total weight of all material in the mix: 37473 lb
Volume of the concrete: 9.347 yd^3
Unit weight of the concrete: 148.49 lb/ft^3
Cement content: 682.037 lb/yd^3
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/20/2023