Summary for Test 2022-11-29-32-2

Test performed: CTM 670-December 2013

Project Information

Project IdentifiersProject ID: 208973
DEA: 120H1004
EFIS: 1200000180
COOP: 120670
DIST-CO-RTE-PM12-ORA-405,73,405,605-9.3/24.3
Award Date11/07/2016
Closeout DateNot set
Work Description(Alternative Delivery) San Diego Freeway (I-405) Improvement Project SR-73 to I-605, Design Build Project, Administered by Orange County Transportation Authority, Caltrans METS to perform Source Inspection per RFP.
Location DescriptionOrange and Los Angeles Counties: 12-ORA-405 PM 9.3/24.2 / 07-LA-405 PM 0.0/1.2 12-ORA-22 PM R0.7/R3.8 / 12-ORA-22 PM R0.5/R0.7 12-ORA-73 PM R27.2/R27.8 / 12-ORA-605 PM 3.5/R1.6 07-LA-605 PM R0.0/R1.2
QA Service Level1 (Verified on 09/10/2015)

Sample Information

Sample Taken Date11/29/2022 Sample Unique Key32
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/07/2022
Sample typeQuality Assurance A brief description of the sampleHRC 500 510 Couplers
The quantity of what the sample constitutes4 From where was the sample collectedJob Site
First name of sampler or witnessed byAlex Last name of sampler or witnessed byAngha
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCMC HRC Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC
Coupler ManufacturerHRC Intermediate Assembler or Fabricator
Rebar Size#8 Coupler ModelHRC 500/510
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)79001741 Rebar Heat Number(s)3114197 6034788
Rebar Size 2 Coupler Unique IDTP-17-03

Test Details

DIME Sample ID: 2022-11-29-32
DIME Test ID: 2022-11-29-32-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2022-12-14

Test Results


Number of Samples Tested: 1
Input Type: Measured
Tester's full name: spaine
Date of test: 12/08/2022
UTM: 400kip
Temperature: 72.00 f
Halo ID:
NumSampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
12No. 8/25mm5000.797376293369Ok Neckingspaine

General comments (publicly viewable) (Max 1000 characters): Ok Necking
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.

Test was verified on 12/14/2022