Summary for Test 2022-11-16-31-1

Test performed: CTM 504-June 2010

Project Information

Project IdentifiersProject ID: 215220
DEA: 07210624
EFIS: 0719000068
DIST-CO-RTE-PM07-LA,SBD-71-1.8/R4.7&R0.0/R0.2
Award Date02/05/2021
Closeout DateNot set
Work DescriptionPLACE STRUCTURE CONCRETE RETAINING WALLS & BOX CULVERT AND PLACE JPCP.
Location DescriptionIN LOS ANGELES AND SAN BERNARDINO COUNTIES IN POMONA AND CHINO HILLS FROM 0.2 MILE SOUTH OF MISSION BOULEVARD OVERCROSSING TO 0.2 MILE OF SAN BERNARDINO COUNTY LINE.
QA Service Level1 (Verified on 03/24/2021)

Sample Information

Sample Taken Date11/16/2022 Sample Unique Key31
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/17/2022
Sample typeQuality Assurance A brief description of the sample3 Concrete Beams JPCP
The quantity of what the sample constitutes10 cubic yards From where was the sample collectedJob Site
First name of sampler or witnessed byFernando Last name of sampler or witnessed byCarranza
Title of sampler Telephone number of sampler
Laboratory sample identification22-3054 Linked DIME Sample ID
The fabricator/manufacturer/facility namen/a Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberLB060008
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected7362770
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedwheelbarrow Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2022-11-16-31
DIME Test ID: 2022-11-16-31-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2022-12-07

Test Results


Input Type: Calculated
Tester's full name: Fernando Carranza
Date of test: 11/16/2022
Air Content: 2.2 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/7/2022