Summary for Test 2022-11-15-27-1

Test performed: AASHTO T27-14

Project Information

Project IdentifiersProject ID: 215023
DEA: 060U4704
EFIS: 0615000301
DIST-CO-RTE-PM06-KER,KIN-5-81.7/87.0,0.0/0.3
Award Date08/12/2020
Closeout Date06/27/2023
Work DescriptionCONSTRUCT CRCP, JPCP AND INSTALL TRAFFIC MONITORING STATIONS.
Location DescriptionKERN AND KINGS COUNTIES NEAR KETTELMAN CITY FROM 0.6 MILE SOUTH OF TWISSELMAN ROAD OVERCROSSING TO 0.3 MILE NORTH OF KERN/KINGS COUNTY LINE
QA Service Level1 (Verified on 06/17/2020)

Sample Information

Sample Taken Date11/15/2022 Sample Unique Key27
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/16/2022
Sample typeQuality Assurance A brief description of the sample3/4 HMA-SP Type A
The quantity of what the sample constitutes750 Tons From where was the sample collectedManufacturer
First name of sampler or witnessed byGurjeet Last name of sampler or witnessed byLitt
Title of samplerTET Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameSPM Avenal-Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number10
Sublot number1 HMA Mix NumberL221154

Test Details

DIME Sample ID: 2022-11-15-27
DIME Test ID: 2022-11-15-27-1
Testing Lab: CT D06 - Millbrook Field Laboratory
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Test Release Date: 2022-11-17

Test Results


What type of gradation is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Does this test use 1/4 sieve? (question for HMA Gradation Type): No
Has the fine aggregate sample been reduced?: No
Input Type: Calculated
Tester's full name: Allen Oliver
Date of test: 11/16/2022
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 99 %
Cumulative percent passing the 1/2 in. sieve: 76 %
Cumulative percent passing the 3/8 in. sieve: 61 %
Cumulative percent passing the #4 sieve: 37 %
Cumulative percent passing the #8 sieve: 24 %
Cumulative percent passing the #16 sieve: 16 %
Cumulative percent passing the #30 sieve: 11 %
Cumulative percent passing the #50 sieve: 8 %
Cumulative percent passing the #100 sieve: 5 %
Cumulative percent passing the #200 sieve: 3.8 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 11/17/2022