Summary for Test 2022-08-25-23-3

Test performed: AASHTO T30-19

Project Information

Project IdentifiersProject ID: 993603
DEA: 051N7004
EFIS: 0521000081
DIST-CO-RTE-PM05-SLO-166-16.0/21.0
Award Date04/22/2022
Closeout Date03/28/2023
Work DescriptionPARTIAL DEPTH RECYCLING AND OVERLAY WITH RHMA (GAP GRADED).
Location DescriptionSAN LUIS OBISPO COUNTY ABOUT 8 MILES EAST OF SANTA MARIA FROM 0.5 MILE WEST OF HUASNA RIVER BRIDGE TO 1.9 MILES WEST OF CUYAMA RIVER BRIDGE.
QA Service Level1 (Verified on 03/28/2022)

Sample Information

Sample Taken Date08/25/2022 Sample Unique Key23
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/25/2022
Sample typeDepartment Acceptance A brief description of the sample3/4" RHMA-G
The quantity of what the sample constitutesL1SL7 From where was the sample collectedJob Site
First name of sampler or witnessed byIsaac Last name of sampler or witnessed byGleffe
Title of samplerQC Telephone number of sampler18053191237
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility namePapich Templeton Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeRHMA-G
HMA Grading3/8 inch Lot number1
Sublot number7 HMA Mix NumberNot set

Test Details

DIME Sample ID: 2022-08-25-23
DIME Test ID: 2022-08-25-23-3
Testing Lab: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2022-10-06

Test Results


Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Glenn Bradley
Date of test: 10/06/2022
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 81 %
Cumulative percent passing the 3/8 in. sieve: 61 %
Cumulative percent passing the #4 sieve: 27 %
Cumulative percent passing the #8 sieve: 15 %
Cumulative percent passing the #16 sieve: 10 %
Cumulative percent passing the #30 sieve: 7 %
Cumulative percent passing the #50 sieve: 5 %
Cumulative percent passing the #100 sieve: 3 %
Cumulative percent passing the #200 sieve: 2.5 %
General comments (publicly viewable) (Max 1000 characters): Dispute resolution testing

Test was verified on 10/6/2022