Summary for Test 2022-10-05-17-2

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 215697
DEA: 07318204
EFIS: 0715000286
DIST-CO-RTE-PM07-LA-Route 1-4.0/4.2
Award DateNot set
Closeout DateNot set
Work DescriptionCM/GC Project - Work consists of constructing secant wall and slope restoration
Location Descriptionnear Point Mugu State Park 0.4 mile South of Sycamore Canyon Road.
QA Service Level1 (Verified on 08/26/2021)

Sample Information

Sample Taken Date10/05/2022 Sample Unique Key17
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/05/2022
Sample typeQuality Assurance A brief description of the sampleWCS PCC Aggregate
The quantity of what the sample constitutes50 CY From where was the sample collectedManufacturer
First name of sampler or witnessed byKevin Last name of sampler or witnessed byHopkins
Title of samplerPlant Inspector Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameAssociated Ready Mix - Oxnard Transportation Laboratory (TL) NumberC100522B
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-19-0054
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedConveyor Belt
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Sizefine
The concrete mix design numberSL4K455WHP Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2022-10-05-17
DIME Test ID: 2022-10-05-17-2
Testing Lab: CT D07 - Plant Services
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2022-10-14

Test Results


Number of tests: 2
Input Type: Measured
Tester's full name: Kevin Hopkins
Date of test: 10/05/2022
Temperature correction: 0
Temperature of solution: 75
Clay reading (test 1): 4.6
Sand reading (test 1): 3.7
Clay reading (test 2): 4.4
Sand reading (test 2): 3.6
Sand equivalent (test 1): 81
Sand equivalent (test 2): 82
Sand equivalent before temperature correction: 82
Sand equivalent after temperature correction: 82
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/14/2022