Summary for Test 2016-08-22-5-2
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 209918 DEA: 07274804 EFIS: 0700000516 |
---|---|
DIST-CO-RTE-PM | 07-LA-18-0.2 |
Award Date | 12/09/2014 |
Closeout Date | 01/15/2018 |
Work Description | REPLACE BRIDGE DECK AND RAILING, REPAIR BENT CAPS AND COLUMNS. |
Location Description | LOS ANGELES COUNTY AT LLANO AT COUNTY LINE OVERHEAD |
QA Service Level | 1 (Verified on 01/08/2015) |
Sample Information
Sample Taken Date | 08/22/2016 | Sample Unique Key | 5 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/26/2016 |
Sample type | Quality Assurance | A brief description of the sample | Couplers |
The quantity of what the sample constitutes | 4 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Sarah | Last name of sampler or witnessed by | Hartz |
Title of sampler | Unknown | Telephone number of sampler | Unknown |
Laboratory sample identification | Unknown | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Nucor BarSplice | Transportation Laboratory (TL) Number | C866884 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | NA | Structure unique identifier | Not set |
Structure name | Not set |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Service | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | Nucor |
Coupler Manufacturer | BarSplice | Intermediate Assembler or Fabricator | Unknown |
Rebar Size | 5 | Coupler Model | DBL BRL Zap Screwlok |
Coating Standards | ASTM A775 | Shape of Rebar | Straight |
Rebar Hoop Diameter | Unknown | Rebar Hoop Fabricator | Unknown |
Coupler Component Heat/Lot Number(s) | 5027 | Rebar Heat Number(s) | PL1520843351 |
Rebar Size 2 | Not set | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2016-08-22-5
DIME Test ID: 2016-08-22-5-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2016-08-31
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: Brian
Date of test: 08/30/2016
UTM: 400KIP
Temperature: 72 F
Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|
1 | 2 | 1 | #5/16mm | 0.31 | 27270 | 87970 | Service Splice | Brian |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Partner Data Point FileTest graph for the Sample
Test was verified on 8/31/2016 ✔