Summary for Test 2022-09-14-52-5

Test performed: AASHTO T308-10

Project Information

Project IdentifiersProject ID: 212775
DEA: 024F2204
EFIS: 0212000073
DIST-CO-RTE-PM02-TRI-3-58.7/61.9
Award Date02/25/2021
Closeout DateNot set
Work DescriptionREPLACE STRUCTURAL CONCRETE BRIDGE AND CULVERTS AND PLACE HMA.
Location DescriptionTRINITY COUNTY NEAR TRINITY CENTER FROM 58.7 MILES NORTH OF PREACHER MEADOWS ROAD TO 60.7 MILES SOUTH OF EL DORADO WAY
QA Service Level1 (Verified on 01/08/2019)

Sample Information

Sample Taken Date09/14/2022 Sample Unique Key52
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/14/2022
Sample typeAcceptance A brief description of the sample16 boxes of Lime Treated 3/4-inch Type A HMA (eq. PG 64-28 M) with 23.6% RAP and virgin PG 58-34 M from Valero (Benicia, CA)
The quantity of what the sample constitutesProduction Start-Up Evaluation From where was the sample collectedManufacturer
First name of sampler or witnessed byCindy Last name of sampler or witnessed byBryant
Title of samplerTET Telephone number of sampler
Laboratory sample identificationD79157 Linked DIME Sample ID
The fabricator/manufacturer/facility nameJ.F. Shea Construction – Fawndale Rock and Asphalt (Redding, CA) Transportation Laboratory (TL) Number857910
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number HMA Mix NumberNot set

Test Details

DIME Sample ID: 2022-09-14-52
DIME Test ID: 2022-09-14-52-5
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2022-09-30

Test Results


What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Khue Yang
Date of test: 09/20/2022
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): 0.19 %
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 4.65 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/30/2022