Summary for Test 2022-09-07-45-1

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 213653
DEA: 044G8204
EFIS: 0413000049
DIST-CO-RTE-PM04-MRN-101-10.6/10.8
Award Date05/05/2020
Closeout Date08/14/2023
Work DescriptionREPLACE SAN RAFAEL HARBOR BRIDGE (ABC)
Location DescriptionMARIN COUTY, IN SAN RAFAEL, FROM ROUTE 101 NORTHBOUND OFF-RAMP TO 2ND STREET
QA Service Level1 (Verified on 05/31/2019)

Sample Information

Sample Taken Date09/07/2022 Sample Unique Key45
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/07/2022
Sample typeQuality Control A brief description of the sampleWashed Concrete Sand
The quantity of what the sample constitutes1 Day From where was the sample collectedJob Site
First name of sampler or witnessed byPedro Last name of sampler or witnessed byDe Haro
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameShamrock Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)19-CAN-01
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedNo Information
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Sizefine
The concrete mix design numberSL-3172CE Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2022-09-07-45
DIME Test ID: 2022-09-07-45-1
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2022-09-12

Test Results


What size aggregate is being tested?: Fine Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Todd Strait
Date of test: 09/08/2022
Cumulative percent passing the 3/8 in. sieve: 100 %
Cumulative percent passing the #4 sieve: 97 %
Cumulative percent passing the #8 sieve: 83 %
Cumulative percent passing the #16 sieve: 68 %
Cumulative percent passing the #30 sieve: 49 %
Cumulative percent passing the #50 sieve: 25 %
Cumulative percent passing the #100 sieve: 7 %
Cumulative percent passing the #200 sieve: 1.9 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/12/2022