Summary for Test 2022-09-02-23-2
Test performed: CTM 231-March 2013Project Information
Project Identifiers | Project ID: 215220 DEA: 07210624 EFIS: 0719000068 |
---|---|
DIST-CO-RTE-PM | 07-LA,SBD-71-1.8/R4.7&R0.0/R0.2 |
Award Date | 02/05/2021 |
Closeout Date | Not set |
Work Description | PLACE STRUCTURE CONCRETE RETAINING WALLS & BOX CULVERT AND PLACE JPCP. |
Location Description | IN LOS ANGELES AND SAN BERNARDINO COUNTIES IN POMONA AND CHINO HILLS FROM 0.2 MILE SOUTH OF MISSION BOULEVARD OVERCROSSING TO 0.2 MILE OF SAN BERNARDINO COUNTY LINE. |
QA Service Level | 1 (Verified on 03/24/2021) |
Sample Information
Sample Taken Date | 09/02/2022 | Sample Unique Key | 23 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/02/2022 |
Sample type | Quality Assurance | A brief description of the sample | Structure Backfill |
The quantity of what the sample constitutes | 1950 ft2 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Manuel | Last name of sampler or witnessed by | Uy |
Title of sampler | Field Materials Tester | Telephone number of sampler | |
Laboratory sample identification | 22-2340 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | structure backfill | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
---|---|---|---|
The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | in place material | |
Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2022-09-02-23
DIME Test ID: 2022-09-02-23-2
Testing Lab: Kleinfelder, Incorporated - Los Angeles
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2022-09-06
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Manuel Uy
Date of test: 09/02/2022
Sum of Count or Density: no data
Average of Count or Density: no data
Sum of Moisture Count: no data
Average of Moisture Count: no data
Count Ratio Density: no data
Count Ratio Moisture: no data
Calculated Percent Relative Compaction: 95.9 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters): In-Place wet density of 2.24 vs Lab Max Wet density of 2.33
Test was verified on 9/6/2022 ✔