Summary for Test 2022-06-02-21-1

Test performed: CTM 208-September 2011

Project Information

Project IdentifiersProject ID: 214573
DEA: 073096U4
EFIS: 0719000091
DIST-CO-RTE-PM07-LA-210-R0.0/R9.7
Award DateNot set
Closeout DateNot set
Work DescriptionPLACE CONCRETE PAVEMENT, BARRIER, HMA, DRAINAGE, AND ELECTRICAL.
Location DescriptionLOS ANGELES COUNTY IN LOS ANGELES FROM INTERSTATE 5 TO WHEATLAND AVENUE UNDERCROSSING
QA Service Level1 (Verified on 06/05/2020)

Sample Information

Sample Taken Date06/02/2022 Sample Unique Key21
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/09/2022
Sample typeVerification A brief description of the sampleScrap Crum Rubber
The quantity of what the sample constitutes1 Qt. Crum Rubber From where was the sample collectedManufacturer
First name of sampler or witnessed byChris Last name of sampler or witnessed byHurtado
Title of sampler Telephone number of sampler
Laboratory sample identification0347G-22 Linked DIME Sample ID
The fabricator/manufacturer/facility nameVulcan Materials-Sun Valley #3 Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeCrumb Rubber Modifier CRM TypeScrap Tire
Crumb Rubber Modifier Mix NumberNot set

Test Details

DIME Sample ID: 2022-06-02-21
DIME Test ID: 2022-06-02-21-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 208-September 2011: Method of Test for Apparent Specific Gravity of Fine Aggregates
Test Release Date: 2022-07-28

Test Results


Input Type: Calculated
Tester's full name: Amir Behjati
Date of test: 06/16/2022
Specific Gravity: 1.18
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/28/2022