Summary for Test 2013-07-16-9003089-4

Test performed: CTM 557-July 2012

Project Information

Project IdentifiersProject ID: 7780
DEA: 112T1824
EFIS: 1100020051
DIST-CO-RTE-PM11-SD-805-4.7/5.6
Award Date01/03/2013
Closeout Date09/07/2018
Work DescriptionREPLACE STRUCTURE AND CONSTRUCT DIRECT ACCESS RAMP (DAR).
Location DescriptionSAN DIEGO COUNTY IN CHULA VISTA FROM 0.4 MILE SOUTH OF EAST PALOMAR STREET OVERCROSSING TO 0.1 MILE NORTH OF NAPLES STREET UNDERCROSSING
QA Service Level1 (Verified on 12/10/2012)

Sample Information

Sample Taken Date07/16/2013 Sample Unique Key9003089
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/18/2013
Sample typeQuality Control A brief description of the sampleconcrete cylinders
The quantity of what the sample constitutes4 cylinders From where was the sample collectedOther
First name of sampler or witnessed byDavid Last name of sampler or witnessed byEngler
Title of samplerNot set Telephone number of samplerNot set
Laboratory sample identificationNot set Linked DIME Sample IDNot set
The fabricator/manufacturer/facility nameVulcan Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierNot set
Structure nameSound Barrier Wall

Material Information

Material TypeConcrete The concrete mix design number103612F
The truck number from where the sample was collected428 The batch plant ticket number from where the sample was collected144218
Concrete batch plantNot set The fabricator/manufacturer designation for the sampleMix
A detailed description of where the material sample was collectedConcrete from wheelbarrow Where the material sample would have been placed if not sampledFooting
From Lot No.Not set Bag Lot No.Not set

Test Details

DIME Sample ID: 2013-07-16-9003089
DIME Test ID: 2013-07-16-9003089-4
Testing Lab: Signet Testing Laboratories - Anaheim
Test Method: CTM 557-July 2012: Method of Test for Temperature of Freshly Mixed Portland Cement Concrete
Test Release Date: 2013-10-15

Test Results


Input Type: Calculated
Tester's full name: David Engler
Date of test: 10/08/2013
Temperature of the freshly mixed concrete: 78 F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/15/2013