Summary for Test 2022-06-07-18-2
Test performed: CTM 231-March 2013Project Information
Project Identifiers | Project ID: 211260 DEA: 072159U4 EFIS: 0715000160 |
---|---|
DIST-CO-RTE-PM | 07-LA,ORA-5-0.0/1.5, 44.3/44.4 |
Award Date | 05/27/2016 |
Closeout Date | 08/01/2023 |
Work Description | CONSTRUCT HOV LANES AND MIX FLOW LANES. |
Location Description | LOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK |
QA Service Level | 1 (Verified on 03/16/2016) |
Sample Information
Sample Taken Date | 06/07/2022 | Sample Unique Key | 18 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/07/2022 |
Sample type | Department Acceptance | A brief description of the sample | Class 2 Aggregate Base |
The quantity of what the sample constitutes | 36 CY | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Jacinto | Last name of sampler or witnessed by | Villanueva |
Title of sampler | TEC | Telephone number of sampler | 8182096574 |
Laboratory sample identification | 22-1366 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Security Paving company | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | Class 2Aggregate Base |
---|---|---|---|
The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | From various locations at Aggregate Base | |
Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2022-06-07-18
DIME Test ID: 2022-06-07-18-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2022-06-08
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Jacinto Villanueva
Date of test: 06/07/2022
Gage No.: 31105
Test No.: 1
Nuclear By: Jacinto Villanueva
Non-Bias Plan No.: 5
Depth: 12
Material No.: on site
Material Type: aggregate base
Impact By: Jacinto Villanueva
Standard Count Density: 2225 g/cc
Count or Density 1: 2.16 g/cc
Count or Density 2: 2.08 g/cc
Count or Density 3: 2.18 g/cc
Standard Count Moisture: 590 g/cc
Moisture Count 1: 0.21 g/cc
Moisture Count 2: 0.24 g/cc
Moisture Count 3: 0.19 g/cc
Sum of Count or Density: 6.42 g/cc
Average of Count or Density: 2.14 g/cc
Sum of Moisture Count: 0.64 g/cc
Average of Moisture Count: 0.21 g/cc
Calculated Percent Relative Compaction: 94.6 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/8/2022 ✔