Summary for Test 2022-05-03-44-2
Test performed: AASHTO T27-14Project Information
Project Identifiers | Project ID: 993150 DEA: 051G9704 EFIS: 0516000008 |
---|---|
DIST-CO-RTE-PM | 05-SB-135-11.7/17.8 |
Award Date | 09/27/2021 |
Closeout Date | 03/28/2023 |
Work Description | COLD PLANE, OVERLAY ROADWAY WITH RHMA (GAP GRADED) AND ADA CURB RAMPS. |
Location Description | SANTA BARBARA COUNTY IN AND NEAR SANTA MARIA FROM LAKEVIEW ROAD TO NORTH SANTA MARIA CONNECTOR |
QA Service Level | 1 (Verified on 08/09/2021) |
Sample Information
Sample Taken Date | 05/03/2022 | Sample Unique Key | 44 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/04/2022 |
Sample type | Quality Assurance | A brief description of the sample | 1/2" RHMA-G |
The quantity of what the sample constitutes | L1SL7 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Isaac | Last name of sampler or witnessed by | Gleffe |
Title of sampler | ARET | Telephone number of sampler | 18053191237 |
Laboratory sample identification | L1SL7 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Calportland-Garey | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
---|---|---|---|
HMA Grading | 1/2 inch | Lot number | 1 |
Sublot number | 7 | HMA Mix Number | Not set |
Test Details
DIME Sample ID: 2022-05-03-44
DIME Test ID: 2022-05-03-44-2
Testing Lab: CT D05 - Santa Maria Field Laboratory
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Test Release Date: 2022-05-23
Test Results
What type of gradation is being tested?: HMA Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Does this test use 1/4 sieve? (question for HMA Gradation Type): No
Has the fine aggregate sample been reduced?: No
Input Type: Calculated
Tester's full name: Salvador Lopez-Zamora
Date of test: 05/03/2022
Cumulative percent passing the 1 1/2 in. sieve: 0 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 95.3 %
Cumulative percent passing the 3/8 in. sieve: 80.1 %
Cumulative percent passing the #4 sieve: 35.9 %
Cumulative percent passing the #8 sieve: 62 %
Cumulative percent passing the #16 sieve: 49.4 %
Cumulative percent passing the #30 sieve: 37.9 %
Cumulative percent passing the #50 sieve: 23.6 %
Cumulative percent passing the #100 sieve: 12.9 %
Cumulative percent passing the #200 sieve: 7.5 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/23/2022 ✔