Summary for Test 2022-02-02-53-1
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 214469 DEA: 030H08U4 EFIS: 0319000029 |
---|---|
DIST-CO-RTE-PM | 03-SAC-50-L0.2/R6.1 |
Award Date | 06/30/2020 |
Closeout Date | Not set |
Work Description | Sac 50 Design Build PLEASE NOTE THAT DESIGN BUILDER MUST PERFORM QUALITY VALIDATION TESTING IN ACCORDANCE WITH THE MATERIAL CONTROL SCHEDULE (MCS) FOR ITEMS SUCH AS STRANDS, HS BOLTS, ELASTOMERIC BEARING PADS, JOINT SEALANTS, COUPLERS & WELDED HOOPS, ETC |
Location Description | FROM 0.1 MILE EAST OF I-5 TO 0.8 MILE EAST OF WATT AVE |
QA Service Level | 1 (Verified on 10/23/2019) |
Sample Information
Sample Taken Date | 02/02/2022 | Sample Unique Key | 53 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/03/2022 |
Sample type | Verification | A brief description of the sample | 3/8" RAP |
The quantity of what the sample constitutes | 2 bags of rap | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Teichert | Last name of sampler or witnessed by | Personnel |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Teichert Woodland | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | Teichert Woodland |
---|---|---|---|
Aggregate Size | Aggregate Source | ||
RAP Stockpile | Stockpile Size (tons) | ||
Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2022-02-02-53
DIME Test ID: 2022-02-02-53-1
Testing Lab: CT D03 - Olivehurst Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2022-04-08
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Julian G
Date of test: 02/21/2022
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data %
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 5.58 %
General comments (publicly viewable) (Max 1000 characters): JMF22-003
Test was verified on 4/8/2022 ✔