Summary for Test 2022-02-12-23-1
Test performed: CTM 203-February 2008Project Information
Project Identifiers | Project ID: 212779 DEA: 021H5804 EFIS: 0216000024 |
---|---|
DIST-CO-RTE-PM | 02-PLU-70-58.4/R78.4 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Not set |
Location Description | Not set |
QA Service Level | 1 (Verified on 01/08/2019) |
Sample Information
Sample Taken Date | 02/12/2022 | Sample Unique Key | 23 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/25/2022 |
Sample type | Preliminary | A brief description of the sample | 1 bag of soil for use in GRE Design |
The quantity of what the sample constitutes | Existing soil at 02-PLU-70-63.05 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Scott | Last name of sampler or witnessed by | Lewis |
Title of sampler | Engineering Geologist | Telephone number of sampler | (530) 225-3516 |
Laboratory sample identification | D79004 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Unknown | Transportation Laboratory (TL) Number | 876436 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | 876440 | Structure unique identifier | |
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
---|---|---|---|
The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | 02-PLU-70-63.05 from slope 0.0 to 1.0 ft depth | |
Where the material sample would have been placed if not sampled | In situ |
Test Details
DIME Sample ID: 2022-02-12-23
DIME Test ID: 2022-02-12-23-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: CTM 203-February 2008: Mechanical Analysis of Soils
Test Release Date: 2022-03-08
Test Results
What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Input Type: Calculated
Tester's full name: Karen Rios Dorado and K. Yang
Date of test: 02/25/2022
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 97 %
Cumulative percent passing the 1/2 in. sieve: 83 %
Cumulative percent passing the 3/8 in. sieve: 75 %
Cumulative percent passing the #4 sieve: 60 %
Cumulative percent passing the #8 sieve: 50 %
Cumulative percent passing the #16 sieve: 41 %
Cumulative percent passing the #30 sieve: 33 %
Cumulative percent passing the #50 sieve: 23 %
Cumulative percent passing the #100 sieve: 15 %
Cumulative percent passing the #200 sieve: 10 %
Cumulative Percent Passing on 1 Micron: 1 %
Cumulative Percent Passing on 5 Microns: 2 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/8/2022 ✔