Summary for Test 2021-12-10-27-1
Test performed: CTM 231-March 2013Project Information
Project Identifiers | Project ID: 215109 DEA: 081C8504 EFIS: 0813000047 |
---|---|
DIST-CO-RTE-PM | 08-RIV-74-0.0/5.8 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | ROADWAY EXCAVATION, HOT MIX ASPHALT, AND STRUCTURAL SHOTCRETE WALLS. |
Location Description | RIVERSIDE COUNTY NEAR LAKE ELSINORE FROM ORANGE COUNTY LINE TO MONTE VISTA STREET |
QA Service Level | 1 (Verified on 02/24/2021) |
Sample Information
Sample Taken Date | 12/10/2021 | Sample Unique Key | 27 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/10/2021 |
Sample type | Quality Assurance | A brief description of the sample | Soil |
The quantity of what the sample constitutes | 900SQF | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Larry | Last name of sampler or witnessed by | Francisco |
Title of sampler | te | Telephone number of sampler | |
Laboratory sample identification | 12102021TEST 03 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
---|---|---|---|
The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | AT THE JOBSITE | |
Where the material sample would have been placed if not sampled |
Combined Gradation Report Information
Combined Gradation Report Id | Bin Index | Dime Test Id |
---|---|---|
No assigned tests for this sample. |
Test Details
DIME Sample ID: 2021-12-10-27
DIME Test ID: 2021-12-10-27-1
Testing Lab: CT D08 - Barstow Field Laboratory 1
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2022-02-18
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: Yes
Input Type: Measured
Tester's full name: Larry Francisco
Date of test: 12/10/2021
Gage No.: 30689
Test No.: 3
Nuclear By: larry francisco
Non-Bias Plan No.: 3 adjusted
Depth: 8
Material No.: SANDYNATIVE- SELECTED
Material Type: DRAINAGE
Impact By: LARRY FRANCISCO
Standard Count Density: 1885 g/cc
Count or Density 1: 1058 g/cc
Count or Density 2: 1086 g/cc
Count or Density 3: 922 g/cc
Standard Count Moisture: 623 g/cc
Moisture Count 1: 83 g/cc
Moisture Count 2: 80 g/cc
Moisture Count 3: 96 g/cc
Density: 2.21
Moisture: 0.12
Sum of Count or Density: 3066.00 g/cc
Average of Count or Density: 1022.00 g/cc
Sum of Moisture Count: 259.00 g/cc
Average of Moisture Count: 86.00 g/cc
Count Ratio Density: 0.54
Count Ratio Moisture: 0.14
Calculated Percent Relative Compaction: 95.5 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/18/2022 ✔