Summary for Test 2021-12-06-15-9

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 212112
DEA: 080C2514
EFIS: 0816000076
COOP: 081645
DIST-CO-RTE-PM08-SBD-10-0.0/13.2
Award Date06/06/2018
Closeout DateNot set
Work DescriptionDesign-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes
Location DescriptionLA/SBD County Line to PM 13.2 near I-15
QA Service Level1 (Verified on 10/16/2019)

Sample Information

Sample Taken Date12/06/2021 Sample Unique Key15
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/09/2021
Sample typeVerification A brief description of the sampleJMF 3/4" HMA-A-SP R15 0.5% LAS
The quantity of what the sample constitutes4 Bags Coldfeed Agg., 2 Bags Rap From where was the sample collectedManufacturer
First name of sampler or witnessed byVulcan Last name of sampler or witnessed byQC
Title of sampler Telephone number of sampler
Laboratory sample identification0661A-21 Linked DIME Sample ID
The fabricator/manufacturer/facility nameVulcan-Corona Drum Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-33-0027::CORONA QUARRY
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number224112 CORD SJR A detailed description of where the material sample was collectedBelt Cut at Vulcan Corona Plant
Where the material sample would have been placed if not sampledAsphalt Paving Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix NumberNot set

Combined Gradation Report Information

Combined Gradation Report IdBin IndexDime Test Id
No assigned tests for this sample.

Test Details

DIME Sample ID: 2021-12-06-15
DIME Test ID: 2021-12-06-15-9
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2021-12-29

Test Results


What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Satish Jain
Date of test: 12/14/2021
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 95 %
Cumulative percent passing the #4 sieve: 61 %
Cumulative percent passing the #8 sieve: 42 %
Cumulative percent passing the #16 sieve: 30 %
Cumulative percent passing the #30 sieve: 22 %
Cumulative percent passing the #50 sieve: 15 %
Cumulative percent passing the #100 sieve: 11 %
Cumulative percent passing the #200 sieve: 8.1 %
General comments (publicly viewable) (Max 1000 characters): Rap Gradation After Ignition

Test was verified on 12/29/2021