Summary for Test 2021-05-11-39-1
Test performed: ASTM C1064-17Project Information
Project Identifiers | Project ID: 214355 DEA: 120K0214 EFIS: 1214000096 |
---|---|
DIST-CO-RTE-PM | 12-ORA-5-12.4/14.5 |
Award Date | 12/20/2019 |
Closeout Date | Not set |
Work Description | South County Improvement Project (Phase 1 - Avery/Crown Valley) PLACE HMA, INSTALL CONC PAVEMENT, RETAIN WALL, MODIFY ELECT SYS. | Add one lane btwn 73 & Oso PKWY |
Location Description | ORANGE COUNTY IN SAN JUAN CAPISTRANO, LAGUNA HILLS, LAGUNA NIGUEL AND MISSION VIEJO FROM 0.5 MILE SOUTH OF AVERY PARKWAY UNDERCROSSING TO 0.8 MILE NORTH OF CROWN VALLEY PARKWAY OVERCROSSING |
QA Service Level | 1 (Verified on 10/31/2019) |
Sample Information
Sample Taken Date | 05/11/2021 | Sample Unique Key | 39 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/12/2021 |
Sample type | Quality Control | A brief description of the sample | 6x12 Cylinders |
The quantity of what the sample constitutes | 33.6 CY | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | Augusto | Last name of sampler or witnessed by | Rios, Jr. |
Title of sampler | QC Insptector | Telephone number of sampler | |
Laboratory sample identification | 429 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Coreslab Structures L A Inc | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 212 |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 78695 - 78697 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | 157 | |
A detailed description of where the material sample was collected | Bed 9 from front discharge RMT into wheelbarrow | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2021-05-11-39
DIME Test ID: 2021-05-11-39-1
Testing Lab: Coreslab
Test Method: ASTM C1064-17: Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
Test Release Date: 2021-12-15
Test Results
Input Type: Calculated
Tester's full name: Augusto Rios, Jr.
Date of test: 05/11/2021
Temperature: 85 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/15/2021 ✔