Summary for Test 2021-11-16-8-4

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 214710
DEA: 051J4704
EFIS: 0517000184
DIST-CO-RTE-PM05-SB-135-17.3/17.6
Award Date05/27/2021
Closeout Date08/17/2022
Work DescriptionBUNNY AVENUE AND NORTH BROADWAY PED IMPROVEMENTS
Location DescriptionSANTA BARBARA COUNTY IN SANTA MARIA AT BUNNY AVENUE AND FROM ROEMER WAY TO PREISKER LANE
QA Service Level1 (Verified on 02/20/2020)

Sample Information

Sample Taken Date11/16/2021 Sample Unique Key8
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/23/2021
Sample typeAcceptance A brief description of the sampleType 2 AB
The quantity of what the sample constitutes458.11 sqyd From where was the sample collectedJob Site
First name of sampler or witnessed bysalvador Last name of sampler or witnessed bylopez-zamora
Title of samplerARET Telephone number of sampler8057483854
Laboratory sample identification334 Linked DIME Sample ID
The fabricator/manufacturer/facility nameCalportland-Rocky CYN Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-40-0013
The fabricator's/manufacturer's product name for the sampleClass 2 aggregate base The fabricator/manufacturer designation for the sample3/4 in Class 2 Aggregate Base
The plant numberCalportland A detailed description of where the material sample was collectedStockpile on jobsite
Where the material sample would have been placed if not sampledRoadway BR1 10378 to 10967 Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2021-11-16-8
DIME Test ID: 2021-11-16-8-4
Testing Lab: CT D05 - Santa Maria Field Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2021-11-24

Test Results


Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Salvador Lopez-Zamora
Date of test: 11/26/2021
Gage No.: 30590
Test No.: 007
Nuclear By: Salvador Lopez-Zamora
Non-Bias Plan No.: no data
Depth: 5
Material No.: no data
Material Type: Class 2 AB
Impact By: Salvador Lopez-Zamora
Standard Count Density: 1736 g/cc
Count or Density 1: 1955 g/cc
Count or Density 2: 1863 g/cc
Count or Density 3: 1691 g/cc
Standard Count Moisture: 632 g/cc
Moisture Count 1: 72 g/cc
Moisture Count 2: 75 g/cc
Moisture Count 3: 71 g/cc
Sum of Count or Density: 5509.00 g/cc
Average of Count or Density: 1836.00 g/cc
Sum of Moisture Count: 218.00 g/cc
Average of Moisture Count: 73.00 g/cc
Count Ratio Density: 1.06
Count Ratio Moisture: 0.12
Calculated Percent Relative Compaction: 95 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters): BR1 Sta 103+78 to Sta 109+67

Test was verified on 11/24/2021