Summary for Test 2021-10-19-36-1
Test performed: CTM 521-June 2012Project Information
Project Identifiers | Project ID: 215129 DEA: 050N73U4 EFIS: 0520000166 |
---|---|
DIST-CO-RTE-PM | 05-SB-101-7.3/9.6 |
Award Date | 10/22/2020 |
Closeout Date | 12/11/2023 |
Work Description | !!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar, |
Location Description | SUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE |
QA Service Level | 1 (Verified on 08/24/2020) |
Sample Information
Sample Taken Date | 10/19/2021 | Sample Unique Key | 36 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/16/2021 |
Sample type | Quality Control | A brief description of the sample | CT 7.18 C+F 25% 1"/PGUHR 4P00 in |
The quantity of what the sample constitutes | 3 cylinders | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Tim | Last name of sampler or witnessed by | Reyes |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Hanson - Goleta | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 725A1Z0P |
---|---|---|---|
The truck number from where the sample was collected | 675 | The batch plant ticket number from where the sample was collected | 550457 |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | SB Hwy 101 Summerland Pile 110 | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2021-10-19-36
DIME Test ID: 2021-10-19-36-1
Testing Lab: Sequoia Consultants
Test Method: CTM 521-June 2012: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2021-11-19
Test Results
Number of specimens: 3
Input Type: Calculated
Tester's full name: Tim Reyes
Date of test: 11/16/2021
Correction factor: 1
Cylinder Age: 28 days
Break Description of Cylinder 1 (if not 'cone'): 3
Break Description of Cylinder 2 (if not 'cone'): 3
Break Description of Cylinder 3 (if not 'cone'): 3
Average Compressive Strength (to nearest 10): 5280 lb/in^2
Compressive Strength of Cylinder 1: 4244 lb/in^2
Compressive Strength of Cylinder 2: 532 lb/in^2
Compressive Strength of Cylinder 3: 4262 lb/in^2
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/19/2021 ✔