Summary for Test 2021-11-16-9-1
Test performed: AASHTO T30-19Project Information
Project Identifiers | Project ID: 214486 DEA: 080K1224 EFIS: 0815000244 |
---|---|
DIST-CO-RTE-PM | 08-SBD-15-R28.6/37.5 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | REHBILIATATE EXISTING MAINLINE AND RAMP PAVEMENT |
Location Description | SAN BERNARDINO COUNTY IN HESPERIA AND VICTORVILLE FROM OAK HILL ROAD OVERCROSSING TO 0.1 MILE SOUTH OF BEAR VALLEY ROAD OVERCROSSING |
QA Service Level | 1 (Verified on 06/23/2021) |
Sample Information
Sample Taken Date | 11/16/2021 | Sample Unique Key | 9 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/17/2021 |
Sample type | Quality Assurance | A brief description of the sample | 1" HMA A |
The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | QC | Last name of sampler or witnessed by | QC |
Title of sampler | TET | Telephone number of sampler | |
Laboratory sample identification | test 1 97 tons out at 2130 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Blue Diamond Victorville | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 1 inch | Lot number | |
Sublot number | 14 | HMA Mix Number | Not set |
Test Details
DIME Sample ID: 2021-11-16-9
DIME Test ID: 2021-11-16-9-1
Testing Lab: CT D08 - Barstow Field Laboratory 1
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2021-11-19
Test Results
Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Larry Francisco
Date of test: 11/17/2021
Cumulative percent passing the 2 in. sieve: 0 %
Cumulative percent passing the 1 1/2 in. sieve: 0 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 92 %
Cumulative percent passing the 1/2 in. sieve: 76 %
Cumulative percent passing the 3/8 in. sieve: 69 %
Cumulative percent passing the #4 sieve: 55 %
Cumulative percent passing the #8 sieve: 42 %
Cumulative percent passing the #16 sieve: 32 %
Cumulative percent passing the #30 sieve: 20 %
Cumulative percent passing the #50 sieve: 13 %
Cumulative percent passing the #100 sieve: 7 %
Cumulative percent passing the #200 sieve: 3.9 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/19/2021 ✔