Summary for Test 2021-10-28-9-3
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 214702 DEA: 030F2864 EFIS: 0320000123 |
---|---|
DIST-CO-RTE-PM | 03-SAC-99-7.92 / 8.4 |
Award Date | 06/24/2020 |
Closeout Date | 11/28/2023 |
Work Description | Remove and replace Consumnes River and Consumnes River Overflow bridge |
Location Description | Sacramento County |
QA Service Level | 1 (Verified on 04/20/2020) |
Sample Information
Sample Taken Date | 10/28/2021 | Sample Unique Key | 9 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/29/2021 |
Sample type | Quality Assurance | A brief description of the sample | #8 Double Barrel Zap Screwlok Couplers |
The quantity of what the sample constitutes | 150 Couplers | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Thien | Last name of sampler or witnessed by | Thach |
Title of sampler | ASR | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | BarSplice | Transportation Laboratory (TL) Number | C739859 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Service | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | CMC |
Coupler Manufacturer | BarSplice | Intermediate Assembler or Fabricator | |
Rebar Size | #8 | Coupler Model | Double Barrel Zap Screwlok |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
Coupler Component Heat/Lot Number(s) | 7075 | Rebar Heat Number(s) | 6026601 |
Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2021-10-28-9
DIME Test ID: 2021-10-28-9-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2021-11-02
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: bewing
Date of test: 11/01/2021
UTM: 400kip
Temperature: 72 f
Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|
1 | 3 | 1 | 8/25mm | 0.79 | 73726.96 | 93325 | Service Splice | bewing |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Bluehill Data Point FileTest graph for the Sample
Test was verified on 11/2/2021 ✔